On August 8, 1944, they proceeded in motor convoy across the
Cherbourg Peninsula moving north to
Bricquebec, France, and at that point they began to work as an operational unit taking its position in the line of advance, with the
First Army on its left flank and the
XII Corps on the right flank. The 1139th Engineer Combat Group was assigned to the
Third Army and attached for operations to the
XX Corps in direct support of the
7th Armored Division. (When a unit is "assigned", it becomes a permanent part of the headquarters to which it is assigned. When the unit is "attached", it comes under the administrative and operational control of that unit to which it is attached.) It was at that point that their executive officer, Lt. Col. George H. Walker, outlined their responsibilities; as part of
General Patton's army the mission of the 1139th Engineer Combat Group was to travel directly behind the armor and remove mines, build bridges, fight as infantry and perform other engineering activities that allowed the rapid advancement of the XX Corps. (The XX Corps played a measurable role in Patton's dash across France in August and early September 1944, earning the nickname "Ghost Corps" for the speed of its advance; starting in Bricquebec, France, they traveled 600 miles in their first 30 days). The XX Corps armored divisions typically traveled many miles ahead of the main body of the army, which resulted in many enemy positions being overrun before alarm could be given. The 1139th Engineer Combat Group arrived in the vicinity of Saint Jean sur Erve, France, on August 10, 1944, and was joined by their first battalions; the 135th, the 179th, and the 206th Engineer Combat Battalions. The initial activity of the Group was to support the
80th Infantry Division in its thrust north against the enemy near Sainte-Suzanne, France. On August 13, 1944, while en route during this advance, the Group removed landmines from roads and shoulders, and the first of the 1139th's bridges were constructed; two 60 foot
Bailey bridges built at St. Mars and St. George, France, on the sites of two bridges that had been blown up by the enemy. (A Bailey Bridge is a temporary pre-fabricated,
truss bridge, quickly assembled from prefabricated, standardized parts, assembled on land and then launched across an opening). Two days later they constructed two
Treadway Bridges M2 across the Huisne River at
La Ferté-Bernard, and at
Nogent-le-Rotrou, France. (A Treadway Bridge is a floating bridge, using pontoons to support a continuous deck for pedestrian and vehicle travel). In his European campaign,
General Eisenhower recognized that the Treadway bridge was an essential piece of equipment to the campaign, easy to transport, quickly installed, and capable of sustaining heavy military loads. On August 17, 1944, the 1139th meet stiff resistance as they were trying to enter
Chartres, France, requiring the 1139th Engineer Combat Group to take on their infantry role. They engaged in firefight operations by cleaning out machine-gun and
anti-tank gun nests in Bonville, France, suffering 6 dead and 12 wounded. They constructed two short Treadway bridges at Luce, France, west of Chartres and removed twelve large bombs from bridges in Chartres. By the next day they were joined by the 7th Armored Division, and the city was finally liberated. The Group then moved north to the vicinity of Treon, France, in support of the 7th Armored Division. There they were tasked with clearing the roads of mines, removing booby-trapped vehicles from roads, de-booby-trapping the Railroad station at
Dreux, France, and filling in road craters in the routes of the advancement. They continued to move rapidly forward, and the
Seine River was reached on August 23, 1944, where they bivouacked in an open field near
Melun, France. At Sainte Sauveur, the 1139th Engineer Combat Group supported the 7th Armored Division in its initial crossing of the Seine River at Tilly by manning
assault boats, by establishing a beachhead and constructing a 504-foot Treadway Bridge while under direct fire, and by constructing a 204-foot footbridge across the canal at Melun. The construction of the foot-bridge was carried on under heavy small arms and 88mm fire. An 88mm shell blew out 50 feet of the bridge during construction, which had to be replaced while under intense enemy fire. Over the next few days, the Seine was bridged in three more places by the 991st and the 994th Engineer Treadway Bridge Companies, the 537th Engineer Light Ponton Company, and the 135th, 179th, and 206th Engineer Combat Battalions. These crossings consisted of multiple span continuous Bailey bridges, a 210-foot Bailey at
Vulaines-sur-Seine, Frances, and a 420-foot Bailey at
Champagne, France. Most of the construction was carried out at night, and took place under enemy fire, resulting in several lives lost. When the bridges were completed, they were guarded and maintained while under considerable fire. On September 15, 1944, when adequate supplies had finally reached the Third Army, they moved on toward Thiacourt. The 135th Engineer Combat Battalion working with the 180th Engineer Heavy Ponton Battalion constructed a 260-foot Heavy Pontoon bridge at Pagny. Because of a shortage of Engineer troops, it was necessary to form a provisional platoon from the Group Headquarters Company to assist in the construction. Then working with the 509th Engineer Light Ponton Company, they constructed two 80 foot Bailey bridges across the Moselle River. The bridge building units worked under constant heavy mortar and artillery fire at these crossings, but were aided by the 161st Chemical Smoke Generating Company laying down a heavy
smoke screen from hundreds of smoke generators and pots. The cost in lives was high, During the month of October 1944, the 1139th Engineer Combat Group grew to one of the largest tactical engineer groups in the United States Army. Over 5000 troops were under their command, including the 5th, 83rd, 90th, and 95th Infantry Divisions, the 179th and 206th Engineer Combat Battalions, the 991st Engineer Treadway Company, the 509th Engineer Light Ponton Company, and the 623rd Engineer Light Equipment Company. This concentration of men and equipment was in preparation of supporting the crossing of the Moselle River by the 10th Armored Division and the 90th and 95th Infantry Divisions. In preparation for this, the troops were instructed in crossing techniques using assault boats, and the Group experimented with building a rapid bridge-launching-device constructed on a tank frame. (While functional, this vehicle was unfortunately found to be so heavy that it was not practical to move for any real distance). The month of November 1944, was of extreme importance to the XX Corps because the crossing of the Moselle River and advancement eastward depended upon the success by the 1139th Engineer Combat Group in bridging the river. Eight bridges were constructed across the Moselle River by the 1139th Engineer Combat Group during the month; two Treadway M2s of 350 and 396 feet in length, one 630 foot Treadway M1, two Floating Baileys of 530 and 440 feet in length, one Baily DS, and two Heavy Pontoon bridges of 730 and 675 feet in length. These crossings were unusually difficult because the Moselle River was in a state of 30-year flood, and the enemy was continually making the bridging difficult with heavy artillery, machine gun and small arms fire. The enemy fire at Cattenom, France, was so intense that the 440 foot Floating Bailey Bridge was eventually lost. In most of these crossings the engineers had to first resort to ferrying operations in order for the infantry to clear a beachhead on the eastern shore so that the bridges could be constructed. Numerous troop losses occurred during these crossings. After the successful crossing of the Moselle River by the 90th and 95th Infantry Divisions and the 10th Armored Division, studies of aerial photographs revealed the need for all the engineers in the Group to help overcome the obstacles left by the enemy; extensive antitank ditches, craters, pill boxes, blown bridges, and numerous mine fields (one minefield alone was estimated to contain 10,000 mines). The burden of this work was so great that the 135th Engineer Combat Battalion was reattached to the 1139th Engineer Combat Group for the purpose of taking over the work in the rear of the division, including filling craters and ditches, destroying pill boxes, constructing fords, marking minefields, posting road signs, changing town signs, and removing the dead to
Graves Registration. Because of the large number of bridges under construction during November, it was also necessary to utilize the 88th Engineer Heavy Ponton Bridge Battalion to haul Bailey bridges from Army Supply Point No. 8 to Thionville, France, and to maintain the Group Bridge Dump there. s ferrying infantry in M2 assault boat over
Saar River erected by 289th Engineers at
Volklingen In December 1944, while planning the crossing of the Saar River, the 1139th Engineer Combat Group was stationed at Niedaltdorf, France. On December 6, 1944, the 90th Infantry Division, located near Wallerfangen, France, was ready to make the assault crossing. The 20th Engineer Combat Battalion began ferrying operations in Assault and storm boats. They ferried across two Battalions and part of a third battalion of the 38th Infantry Regiment, while the 179th Engineer Combat Battalion ferried the 1st and 2nd Battalions of the 357th Infantry Regiment. Following these operations the storm boats continued to evacuate wounded and to deliver supplies. Although all operations of the river were carried out under continuous heavy artillery and small arms fire day and night, there was no letup in the steady flow of materials and supplies by the storm boats. However, the incoming fire was so heavy that power boats could not be brought down to the river for launching. After several unsuccessful attempts, a ferry was constructed on December 8, 1944, for ferrying vehicles, anti-tank guns and tanks across the river at Wallerfangen, with additional ferries at Pachten-Dillingen and Rehlingen-Siersburg, France, which made it possible to ferry all the vehicles and tanks of the 90th Infantry as rapidly as they were needed to secure a beachhead on the eastern shore. This was of importance since a floating bridge was not able to be constructed, since sections were shot away as rapidly as they were placed into the water. The Saar across from Dillingen, Germany, continued to prove difficult to cross because of heavy fire from a large number of occupied German
pill boxes on the eastern side of the river where the
Siegfried Line had been most heavily constructed. As a result, a bridgehead was not expanded there to any great depth, although ferrying operations continued until December 20, 1944. These activities were interrupted as Germany made its last major offensive campaign; the
Battle of the Bulge (also known as the Ardennes Counteroffensive). When General Patton learned of the attack, he quickly repositioned six full divisions of his army from their locations along the Saar River to launch a counterattack north to relieve the
U.S. 101st Airborne Division which had been trapped at Bastogne. To replace the repositioned defensive divisions along the Saar River, the 90th Infantry Division withdrew from their eastern beachhead at Dillengen to join the 95th Infantry Division in defending the western side of the river. The 1139th Engineer Combat Group supported both divisions in constructing defensive barriers consisting of mine fields, roadblocks, and bridges prepared for demolition, as well as guarding many of these deterrents. During January 1945, the 1139th Engineer Combat Group continued to support defensive operations on the west bank of the Saar River, consisting of barrier zone and roadwork maintenance, installation of an anti-mine boom at Maimühle, roadway snow-plowing and sanding, guarding displaced German citizens at Niedaltdorf, removing mines and booby traps at Thionville, and patrolling the banks of the Moselle River. By February, the Germans were in full retreat from the Ardennes. During the first three weeks of February 1945, the 1139th Engineer Combat Group was engaged in miscellaneous engineer activities in support of the 94th Infantry Division and the 3rd Cavalry Regiment. Because of sudden thaws supplemented by heavy rains, the Moselle River was swollen to flood heights again. As a result, great ice floes were swept down the river with such force that it necessitated the removal of all floating bridges. The salvaged materials were removed and placed in the storage dumps, and as soon as possible the bridges were reconstructed to allow traffic over the Moselle again. On February 20, 1945, the 1139th Engineer Combat Group was given the mission of assisting the 94th Infantry Division in its assault crossing of the Saar River. Under heavy enemy fire coming from strategically located pill boxes on the east bank, three successful assault crossings were made between the 21st and 23 February at Taben, Serrig, and Ayl, Germany. The first bridge crossings of the Saar River under the direction of the 1139th occurred February 24 and 26, 1945. The 135th Engineer Combat Battalion installed a 240-foot Treadway bridge at Taben, and a 286' Heavy Pontoon Bridge at Saarburg, and the 993rd Engineers Treadway Bridge Company built a 320-foot Treadway Bridge at Serrig, allowing the 94th Infantry Division to cross the Saar River and established a vital bridgehead at Serrig. This, in turn, allowed a 286-foot Heavy Pontoon bridge and a 336-foot Treadway bridge to be built across the Sarr at Niederleuken and Schoden, so that both Infantry and Armor could cross and reduce the enemy on the eastern side of the Saar. On March 6, 1945, an additional 336-foot Treadway M2 C1 bridge was then established at Konz Karthaus by the 179th and the 206th Engineer Combat Battalions. During the first part of March 1945, the 1139th Group was engaged in engineering work necessary for the rapid advancement of the XX Corps from the Saar to the Rhine Rivers. In addition to construction of many Bailey Bridges and small fixed bridges, they were tasked with supervising civilian labor on road work, preparing gun emplacements for artillery pieces, constructing camouflage screens and anti-mine booms at bridges, removing dead animals from minefields, hauling prisoners, demolishing buildings to widen roads, painting town signs, and destroying enemy tanks and artillery pieces. In quick secession the American Armies were converging on the enemy in the Rhine-Moselle triangle; the
4th Armored Division from the North, the
10th and
6th Armored Divisions from the South, and the
3rd and the
7th Armies from various locations.
Lieutenant Colonel Omar Bradley told General George S. Patton, whose U.S. Third Army had been fighting through the
Palatinate to "take the Rhine on the run." The Third Army did just that on the night of March 22, 1945, crossing the river with a hasty assault south of Mainz at Oppenheim by the
17th Armored Engineer Battalion on a 1,152 foot long Treadway M2 Bridge. It was there on March 24, 1945, that Patton showing his contempt for the enemy, made good on his pledge to "piss in the Rhine", which he did from a pontoon bridge in full view of his men and news cameras. Then on March 25, 1945, while in the area of Ober-Hilbersheim, the 1139th received orders to make a major river crossing over the Rhine River at Mainz. Extensive studies were made by the 1139th Engineer Combat Group to determine the best site for crossing. Study of all available maps and photos determined that the downtown area of Mainz, was the best site, even though the Rhine was wider at that point. Profiles were prepared for the entire area, showing which terrain areas had to be captured or neutralized by artillery fire, and hydraulic data and river bed materials were studied to understand the types and sizes of anchors necessary for the bridge. Finally, site reconnaissance at the river's edge by Group personnel determined the exact location for the bridge. This crossing required two assault operations led by the 80th Infantry Division with support from the 135th Engineer Combat Battalion. The first infantry crossing (using assault boats) incurred a high casualty rate, so the two battalions were then crossed by the 1139th Engineer Combat Group supported Naval units. Once the infantry was ashore, ferrying operations were carried on by Navy operated boats, using 6
LCMs and 6
Higgens Boats. During the launching there was heavy artillery fire, 20mm and small arms fire on the site, knocking out a bulldozer and killing a naval officer. However, the 997th Engineer Treadway Company with assistance from the 160th Engineer Combat Battalion was able to construct a Treadway M2 Bridge across the Rhine 1,896 feet long;
the Longest Tactical Bridge built in the European Theater of Operations. This bridge served the entire XX Corps in crossing the Rhine and marked the end of the assault phase of the Rhine in the Third Army area. Once across the Rhine, they found the enemy largely routed and in full retreat. On March 31, 1945, the Third Army started its run towards Berlin, from Mainz, traveling north-east through Frankfurt to Friedberg, to Alsfeld, then crossing the Fulda River with a 312-foot Treadway M2 Bridge, on to Reichensachsen. Then traveling eastward they next bridged the Werra River and traveled to Langensalza, and after bridging the Helme River on April 11, 1945, they traveled along the
Autobahn for two days constructing Bailey Bridges where needed to repair sections of the highway that had been destroyed by allied bombardment. While traveling the Autobahn, they came across an area where the median strip had been paved as a landing airstrip and painted green, and on it sat an unusual-looking plane with no propeller. It turned out to be one of the German Jet planes that had been abandoned during the rapid retreat of the German Army. The 1139th stopped in Weimar, on April 13, 1945. Here they were situated in the most luxurious barracks that they had stayed in; formerly used by German Anti-aircraft troops. However, it was also here that they saw their most horrible of all sights; the
Buchenwald Concentration Camp. The Third Army had liberated the camp just two days earlier. At the urging of General Patton, many of the 1139th troops visited the camp and saw the walking skeletons, stacks of withered corpses, and incompletely burned bodies, pits of lime covered bodies, and all saw emaciated inmates from the camp walking along the road towards Weimer, and heard firsthand accounts about the horrors from a former Captain of the Dutch army, who was taken in from the camp to act as an interpreter. On April 16, 1945, the Third army continued moving eastward until it arrived just outside of Chemnitz. At this point, they were only 135 miles from Berlin. However, with the threat of a
National Redoubt (potential reorganization and resistance by the remainder of the German army),
Eisenhower ordered Patton's army southward toward Bavaria and Czechoslovakia, anticipating a last stand there by Nazi German forces. The XX Corps raced south-westward to Lichtenfels; bridging the Saale and the Weisse rivers, arriving April 18, 1945. Then turning southeast they bridged the Main River and traveled to Pegnitz, and after spanning the Naab River with a 240-foot Treadway M2 Bridge arrived in Burglengenfeld on April 25, 1945. On April 27, 1945, they traveled to Regensburg where they stopped to develop plans for crossing the Danube River. Then continuing into southern Bavaria, they constructed a 516-foot Treadway M2 Bridge to cross the Danube, arriving in Straubing on April 30, 1945. On May 2, 1945, they left Straubing and constructed a 288-foot Treadway M2 bridge to cross the Isar River at Landau an der Isar, and arrived in Ortenburg on May 3, 1945. On May 4, 1945, the 1139th constructed a 560-foot Heavy Pontoon Bridge over the Inn River at Passau, and the next day they left Ortenburg and moved southeastward to Lambach, Austria, where contact was made with the Russian forces. This was the furthest they traveled in search for the National Redoubt by the German Army. It was here, on May 7, 1945, that the troops heard that finally Germany would officially surrender the next day. The same day General Walton H. Walker, commander of the XX Corps, received the unconditional surrender of Generaloberst
Lothar Rendulic, commander of German
Army Group South. The 1139th constructed a 516-foot Treadway M2 Bridge across the Isar River at Plattling, Austria, and on May 9, 1945, they constructed their final bridge, a 755-foot Heavy Pontoon Bridge over the Inn River at Schaerding, Austria. On May 10, 1945, the 1139th left Lambach, Austria and began their return home moving north-eastward to Ried im Innkreis, Austria. == The 1139th as part of the Army of Occupation in Germany ==