NextEra Energy Resources has solar facilities located in 16 states in the U.S., 1 province in Canada, and 1 province in Spain. In February 2018, NextEra Energy Resources filed a lawsuit against the
United States Department of the Treasury for $127 million. In May 2018, the commissioning was held for
Arkansas' largest universal solar project, Stuttgart Solar Energy Center (81.0 MW) in
Arkansas County, Arkansas, after construction was completed by NEER in partnership with
Entergy Arkansas. Pinal Central Solar Energy Center, the largest universal solar project in
Arizona, was also opened in
Pinal County, Arizona (20 MW) along with a 10-megawatt
lithium-ion battery storage system after construction was completed by NEER in partnership with Salt River Project (SRP). As of May 2018, NEER has 32 universal solar projects and several small scale private generation solar projects in operation, producing a net total of 2,153.7 megawatts (MW). Notable solar projects are listed below: •
Desert Sunlight Solar Farm in
Riverside County, California (179.1 MW) •
Genesis Solar Energy Project in
Riverside County, California (162.8 MW) •
Solar Energy Generating Systems (SEGS) in Kramer Junction, California (67.5 MW) • Appleseed Energy Center in
Cass County, Indiana (200 MW) ==Nuclear power==