AFCEE was formed by consolidating a variety of Air Force personnel and assets located throughout the country, including several Air Force Regional Civil Engineer staff functions. The center was formally inaugurated with a
ribbon-cutting ceremony in
Brooks AFB Hangar 9 on 3 November 1991. It originally consisted of four major elements: the Environmental Services Office, the Construction Management Office, the Design Group, and three Regional Compliance Offices (later renamed Regional Environmental Offices). Staff elements included Mission Support, Environmental and Contract Law, and
Public Affairs. In addition, a division from the Human Systems Contracting Directorate was assigned to AFCEE to provide the center with dedicated environmental contracting support. The center, which had started out with only a handful of people, grew rapidly and within a year had in place a full service array of environmental cleanup contracts. Its concentration was on the 19 installations affected by Rounds I and II of the
Base Realignment and Closure process. AFCEE underwent reorganization in 1994. A major change was the transition of the
Pollution Prevention and Environmental Planning Divisions of the Environmental Services Directorate into two separate directorates. The execution directorates thus were: Construction Management, Design Group, Environmental Conservation and Planning, Environmental Restoration, and Pollution Prevention. AFCEE did not have a building of its own when it first began operations. Employees worked in different facilities throughout Brooks, some in leased modular buildings. However, in July 1994 ground was broken for the new, nearly 73,000 square foot (6,800 square meter) headquarters building. A year later, a ribbon-cutting ceremony formally inaugurated the center's new home. Organizational streamlining took place in April 1997, with Construction Management and the Design Group merging into one organization called the Design and Construction Directorate. In other changes, the Pollution Prevention Directorate was renamed the Environmental Quality Directorate and the former Design Group's Planning Division moved to the Environmental Conservation and Planning Directorate, completing the establishment of a Comprehensive Planning Division. ==Personnel and resources==