APNG-2 reused part of the
optical fibre cable that formerly linked Australia to
Guam.
Recovery and relaying An section of the PacRimWest cable was recovered from just south of Guam, with the ship sailing towards the
Solomon Islands. The ship then recovered a loop of the PacRimWest cable off
Rockhampton, Queensland, broke it, and spliced it to the Sydney end of the recovered section, sailed towards PNG, made landfall at Ela Beach near
Port Moresby, where a terminal station from Guam was re-established to link to the Telikom PNG network.
Capability PacRimWest is a fibre-optic cable with two fibre pairs. These will be used to provide APNG-2 with around 1100 Mbit/s data capability, consisting of 2 × 565 Mbit/s PDH systems with all electronic regeneration. ==Cost==