Maclovio Barraza Parkway/Downtown Links Project After the passage of the Regional Transportation Authority plan in 2006, a portion of the sales tax increase paid for an extension plan of the parkway from Broadway Boulevard to 6th Street called Downtown Links. The new road, called the Maclovio Barraza Parkway, would go alongside the
Union Pacific Railroad. Also, the railroad crossing on 6th Street, west of Stone Avenue, will be improved, providing a new underpass above the railroad. This will allow direct access from I-10 to the new parkway via 6th Street. The Maclovio Barraza Parkway is a 4 lane, 30
Mile per Hour roadway connecting Broadway Boulevard to 6th Street. Construction of the parkway began in August of 2020 in the second phase of the RTA plan. The new Maclovio Barraza Parkway opened to all traffic on February 17, 2023. As of 2025, however, the 6th Street underpass is still under pre-construction.
Southeastern Tucson extension In 2011, ADOT started a study to connect SR 210 to I-10 at Alvernon Way in southeast Tucson. The new roadway would be built to freeway standards from I-10 to the current terminus at Golf Links Road. In December 2020, ADOT released final design concept report on the extension as part of the I-10 widening project. SR 210 will be extended to I-10 at the Alvernon Way interchange. The eastern terminus interchanges at Alvernon Way and Golf Links Road will be reconfigured into a single interchange. SR 210 will be extended southward as a freeway along the Alvernon Way right-of-way with an interchange at Ajo Way. The extension will be phases five, seven, eight, and nine of the 18 phase I-10 widening project, which is expected to cost $1.2 billion. ==Exit list==