The first phase of this
motorway, dating to the 1950s, was designed to provide an alternative route between the Po Valley and the coastal
Tyrrhenian Sea. The construction required several
viaducts and
tunnels to attain the maximum altitude of 745 metres above sea level at the entrance of the tunnel crossing. Built as a
dual carriageway (divided highway), it is very curvilinear and challenging to drive and, therefore, has long been used for testing new
heavy duty vehicles. Except for short stretches of the highway, the
road surface is not
porous or fitted with
storm drains, making it difficult to negotiate during heavy rain. ==Route==