Barrow for Tarvin railway station was in Barrow, Cheshire, England. The station was opened by the Cheshire Lines Committee on 1 May 1875 as Tarvin & Barrow, but renamed in 1883 to better reflect its location. A goods shed and sidings were provided to the west of the passenger depot, which was provided with standard CLC main buildings on the Manchester-bound side and a brick shelter on the Chester-bound platform. The sidings were worked from a signal box on the up (northbound) platform.