,
75th Division The attack began on 18 November, with the
Australian Mounted Division clearing
Latron, which was in the way of the 75th Division. The next day the Yeomanry Mounted Division with the furthest to go moved off first. Followed by the 52nd (Lowland) Division which departed from Ludd and the 75th Division from Latron. The two other divisions travelling astride nothing more than tracks, found it more difficult and their vehicles and heavy weapons had to turn back. The advance also coincided with the start of the winter rains, which not only affected the terrain, but also caused problems for the troops, who were only equipped for a desert war and lacked any winter clothing. However, the 52nd Division did reach
Beit Likia and the Yeomanry Division
Beit Ur el Tahta by the end of the first day. The 75th, advancing along the only real road in the area, made good progress, fighting through the Ottoman hilltop defences, secured the villages of
Saris and
Kuryet el Enab on 20 November. The first village in the afternoon, the second before nightfall, in an infantry assault under cover of a thick belt of fog, which obscured the defenders vision. They had however only come up against rearguard positions and still had to face the main Ottoman force. Elsewhere the 52nd Division were making some progress but the yeomanry were confronted by a strong position of 3,000 infantry supported by artillery on the Zeitun ridge west of Bireh. During a back and forwards battle the yeomanry did at one stage capture the position, but were forced back again on 21 November. On the same day, the 75th Division changed the direction of the attack north-east towards Biteh, to meet up with the mounted division. The division was stopped at
Biddu, and the heights of Nebi Samwil. Fighting through the day, the village was eventually taken by the
234th Brigade that evening. However the two infantry divisions were now bogged down and no further progress could be made. Considering the heavy casualties which had been sustained by his command, General Bulfin requested that XX Corps take over the line and by 28 November the relief of the various of XXI Corps positions was completed. In obtaining a footing on some of the most difficult hills on the Judean heights, the efforts of the 52nd and 75th divisions enabled General Allenby to initiate a new plan to capture Jerusalem so they share the honour with the 53rd, 60th (who were already attached to the XX Corps at Latrun) and 75th Divisions, as well the Yeoman Mounted division, which were present at the finish. == Aftermath ==