Surf bathing had become a mass leisure pursuit after World War One. In 1923 Waverley Council commenced the implementation of the Bondi Beach and Park Improvement Scheme. The scheme included provision of a kiosk and surf sheds, three lavatory blocks, a band stand, parks to surround the buildings and increased car and pedestrian facilities. A competition was held to design the structures and was won by the architectural firm of Robertson and Marks. The foundation stone marking the commencement of the project was laid in May 1928. In October
The Sydney Morning Herald photographed the building, which was still under construction, as shown below. The pavilion was a very ambitious project. It had extensive dressing cubicles, which were originally in two courtyards on the ground floor of the building. One courtyard was for men and the other for women, and the individual changing booths were constructed in rows in each courtyard. These rows within the courtyards can be seen in the photograph above. It also had Turkish and hotwater baths, shops, a ballroom, cabaret theatre, an auditorium and a cafe. Tunnels leading from the two courtyards passed underneath Marine Parade (now Queen Elizabeth Drive) to a pair of concrete
groynes which opened onto the beach. The pavilion was not officially opened until the end of 1929. However, by October 1928 the project was sufficiently completed to allow people to use the dressing accommodation. The council placed the advertisement shown below, outlining the attractions of Bondi. ==Opening==