Eastern Region The first 38 locomotives entered service in 1958-59 from the
Eastern Region depots at Stratford, Hornsey and
Ipswich engine shed on
commuter services into London, where they were evaluated against rival designs from
English Electric,
British Railways,
Birmingham RC&W and
Brush. The type proved chronically unreliable in Eastern Region service - by March 1960 the Hornsey allocation had moved to New England Yard, Peterborough for storage. This came to the attention of the newspapers and the
Daily Telegraph reported that brand new diesel locomotives were being hidden and dumped, which caused questions to be asked in Parliament. The D6100s moved north to the
Scottish Region in mid-April 1960, ostensibly to be nearer to the NBL works for repairs but allegedly to move them away from the eyes of the national press.
Scottish Region The final 20 locomotives had uprated engines and were delivered to Kittybrewster depot on the
Scottish Region. They were joined on the Scottish Region by the first 38 locos, which were allocated to Glasgow Eastfield depot, close to the North British factory at Springburn where they had been built. They were used widely across the Scottish Region on a range of work, freight, local passenger and express passenger, the latter sometimes in pairs. Common double headers included Oban & Callander workings, Glasgow-Dundee/Aberdeen expresses, and many freights, and the Ballater Royal train was entrusted to two locos with a standby. They were common on the West Highland lines, Great North of Scotland lines and in the works. Just one original locomotive, D6109, was repainted in BR Blue with headcodes.
Problems They proved to be unreliable in service, and during 1960 the Eastern Region fleet was transferred to Eastfield depot on the Scottish Region for convenience of return to their manufacturer when
warranty work was required. However, the
North British Locomotive Works closed in 1962, by which time the type's principal shortcomings had become plain. D6100s suffered problems with the coupling between the power unit and the generator. The engines themselves were a
MAN design, but which were built under licence by NBL and of inferior quality to the German originals. Engine cooling systems proved to be inadequate, diesel engines leaked and were not constructed to the appropriate tolerances, cylinder heads fractured and lubricating oil escaped into the battery compartments located below the power unit. These flaws were mostly rectified on a rebuilding programme in 1961–62. The positioning of minor components within the locomotive bodyshell meant that small faults could only be rectified on depot or by return to a railway workshop, which resulted in poor daily availability for traffic figures for the type. Engine room fires were common and wrote off several locomotives. However the later batch, with the B series engine, proved more reliable but still suffered problems. Problems with the NBL/MAN engines are detailed in a report prepared at Swindon in September 1962. This related to the Class 22 but similar problems were experienced with the Class 21. ==Rebuilding==