TransPennine Express announced in 2016 that they were to procure 126 new vehicles from CAF, which included 66 Mark 5A locomotive-hauled coaches. They would be formed into 13 five-carriage sets, hauled by locomotives. This equates to 65 coaches for total service, with the 66th coach being a spare Driving Trailer. Each set is composed of one
first class carriage with guard's area and catering provision, one standard class carriage with PRM toilet, two standard class carriages and a standard class Driving Trailer (DT). In October 2016, production started on these coaches, and in March 2017, CAF and TPE released a photo of the first completed bodyshell. The first completed rake was sent for testing at
Velim test centre in March 2018, the second set being delivered straight to the UK in May 2018 via
Royal Portbury Dock ahead of their planned entry into service in the autumn of that year. In April 2019, the first
Nova 3 set was officially handed over from CAF to TPE, after a mandatory period of fault-free running. TransPennine Express branded their new trains under the general name
Nova, with the Class 68 + Mark 5A combination given the name
Nova 3. == Current operation ==