Palatul Telefoanelor in Bucharest is an
Art Deco style building and until 1956, was the tallest building in Bucharest at . The worldwide
Great Depression that began with the
Wall Street crash of 1929 also affected Romania, strongly impacting the
Romanian economy. The Romanian government decided to take a loan from the American trust,
J.P. Morgan & Co., which obtained from this transaction the granting of a 20-year monopoly on Romanian telephony to the
International Telephone and Telegraph Corporation (ITT), which then formed the Societatea Anonimă Română de Telefoane (SART, "Romanian Telephone Company, Ltd."). The aim was to modernize Romanian telephony and to construct the Telephone Palace. Designed on behalf of SART by the Romanian architect of Dutch origin
Edmond Van Saanen Algi and built over the course of about 20 months in 1931–1933, it was the first major modernist building on Bucharest's
Calea Victoriei, the street of which Tudor Octavian wrote, "this is how the whole of Bucharest would look if we had been allowed..., if its builders had been clever enough..." It was constructed on the former site of the Oteteleșanu Mansion, which had been, since the turn of the century, home to a terrace bar (Terasa Oteteleșanu), a coffee house and a beer saloon, competing with
Casa Capșa for the custom of Bucharest's elite from its location next to the old
Romanian National Theatre. The steel skeleton was produced by the
Reșița steelworks. The building was inaugurated in 1934 in the presence of
King Carol II. The building was extended (both vertically and horizontally) in 1940 and 1946, and survived earthquakes in
1940,
1977,
1986, and
1990, as well as
bombing in 1944 by
Allied Forces during
World War II. With the advent of
the Communist era, the building passed into the hands of the Romanian government, along with SART itself, which was nationalized as a division of the Ministry of Posts and Telecommunications. The
1989 Revolution resulted in the establishment of the independent ROM-POST-TELECOM, reorganized as Romtelecom in July 1991. A 1993 study revealed structural problems (the roof was never designed to support microwave antennas, but only a coffee shop); before a major reconstruction project could be started in 1997, engineers had to begin by redrawing building plans, as the originals had been lost. Work included reconstruction to duplicate the original façade, as well as structural reinforcement. The reconstruction design was made by Romanian architecture office Proiect Bucuresti. The whole project, which ultimately employed 700 people, cost roughly
€1 million and lasted until 2005. ==Notes==