Phase I The first phase is a six-lane fully access controlled carriageway from
Perungalathur on the
Grand Southern Trunk Road (NH 32) to Maduravoyal which lies on the
Chennai–
Bengaluru NH-48. A 3-tier trumpet interchange has also been constructed at the starting point at
Irumbuliyur. It was inaugurated in April 2008. The road runs through
Thiruneermalai,
Pammal,
Anakaputhur, Tharapakkam,
Kovur,
Porur,
Vanagaram to reach
Maduravoyal.
Phase II The second phase include extending the bypass by from Maduravoyal to Puzhal on the Chennai–
Kolkata NH16 and four-laning it. It also includes two interchanges. There are a clover-leaf grade separator at
Maduravoyal Junction and a trumpet interchange at Puzhal where the bypass phase II ends.
Elevated road A elevated six-lane corridor forms the part of Phase II being executed currently. This elevated road cuts through the industrial estate in
Ambattur. This corridor ends with a road over bridge (RoB) crossing the
Chennai–
Jolarpet railway line. The elevated corridor was completed in June 2009 at a cost of 1000 million. == Interchanges ==