The airport is undergoing a massive rebuild, making it capable of handling
Boeing 737 and
Airbus A320 aircraft. The foundation stone for a new terminal building and an ATC tower was laid by the former
Union Civil Aviation Minister,
Suresh Prabhu in February 2019. The new terminal complex is built at a cost of ₹ 71 crore and cover an area of 3,900 square metres. It have 10 check-in counters, and a peak hour handling capacity of 300 passengers. Along with this, the runway length is being extended to 2,300 metres, a new combined
Air Traffic Control (ATC) tower, a fire and rescue building, and expanding its apron and related equipment are included. The
Maharashtra Industrial Development Corporation (MIDC) has acquired 223 hectares of adjoining land in five villages at the cost of ₹ 240 crore for this purpose. The new terminal has been under construction since 2019, and is expected to be completed by early 2024. As of April 2021, the runway has been lengthened from 1,370 to 1,930 metres to the east of the airport, and an additional 64 acres near to state highway 277 is acquired to further extend to the full 2,300 metres. Installation of night landing facilities at the airport was completed on the runway in late 2021. The airport has been facilitated with aviation fuel facility, which means that the aircraft landing here will have the facility to refuel while on halt. The facility, according to experts, will help in carrying more passenger load, which eventually will help both the airlines as well as the passengers. The facility was provided by
Hindustan Petroleum, and will henceforth remain available on a permanent basis. Earlier, the limited availability of the fuel restricted the number of passengers on board an aircraft to some extent. However, that would not be the case any more. With the availability of aviation fuel, the number of passengers will increase. The airport is presently connected with
Ahmedabad,
Bengaluru,
Hyderabad,
Mumbai,
Nagpur and
Tirupati, with daily and weekly flights provided by
IndiGo and low-cost airline
Star Air. More airlines and routes will join in the coming years once the runway length will be extended to 2,300 meters. == New Terminal ==