EMU stops at the platform 11
Station hall Chongqing West Station has been constructed as a national Principal station. Constructed over 3 years, starting in 2014, it covers an area of 120,000 square metres, with a T-shaped exterior facade. Consisting of 6 floors, 3 above and 3 below ground. It will be expected to handle 15,000 people at any single time within the main hall complex. • The total building area of the station building is nearly 119600 square meters. • The main Northern and Southern sides have a width of 276 meters, with the narrowest place being 150 meters. • The Eastern and Western sides have a length of 420 meters. • The total height of the station hall is 37 meters at an elevation of 33 meters. Chongqing West Station adopts the modern Chinese practice with high speed railway stations with a "comprehensive traffic, three-dimensional layout". This refers to having the Waiting Hall, Platforms and Arrivals Halls on separate levels. The Station Hall has divided across five layers, with the main railway passenger station hall, a long-distance bus station, local city bus station, metro, taxi station, rental vehicles and private vehicle parking facilities. • The top two floors above ground are fitted out as the main railway station Waiting Hall. • Platforms are located on the middle level of the building at ground level. It also features the ticket hall, public squares on both sides, long-distance bus station and local city bus stop. • Below ground level is the Arrivals Hall and
Chongqing Rail Transit metro system Ticket Office. • The underground Minus Two level provides transfer with the CRT
Line 5 (Under Construction) • The underground Minus Three level provides transfer with the CRT
Loop Line (Under Construction)
Platform layout Chongqing West Station consists of 15 platforms (1
side platform, 14
island platforms) that serve 29 tracks. ==Naming confusion==