The Soubré Power Station is a 275 megawatts hydroelectric power station across the Sassandra River, in the Ivory Coast. The station was commissioned on 2 November 2017, after four years of construction. This renewable energy infrastructure is owned and operated by CI Energies, the Ivorian electric utility parastatal company. The dam and power station were funded 85 percent by Exim Bank of China, though a loan and by the Government of Ivory Coast, through 15 percent equity investment. The power station's 1,200 GWh in annual energy production contributed an estimated 10 percent to national generation capacity in 2017. The station was the largest hydroelectric energy source in Ivory Coast, at the time it was commissioned.