CIOS has
landing points in
Ayia Napa (),
Cyprus and
Nahariya (), Israel]. It has a design transmission capacity of 622 Mbit/s and a total cable length of 250 km. The system was supplied by AT&T Submarine Systems and was the longest non-repeatered commercial system at the time. Operations began on 11 April 1994. ==See also==