in August 2007 The tram route was introduced on 29 April 1994, requiring a small track extension along
Spring Street, between
Collins and
Flinders Streets, to enable a complete CBD loop to be formed. The travel time around the circle before this change was 40 minutes. Between May and November 2005, the route temporarily ran between Flinders Street / Spencer Street and Victoria Parade / Nicholson Street due to the closure and removal of the
Flinders Street Overpass over
King Street. During early 2006, new
Passenger Information Displays were installed along with Digital Voice Announcements. In April 2008, the service adopted the
daylight saving timetable on a permanent basis, operating from 10:00 to 21:00 every Thursday, Friday and Saturday. The end of service at other times is 18:00. Services after 18:00 between Thursday and Sunday were removed in November 2020. Due to driver shortages, the route's operator,
Yarra Trams, has found it hard to run all City Circle tram services. Due to this, since 30 October 2023, the route only runs in a clockwise direction between 9:30 and 17:30 daily. ==Route==