region FMG acquired the Cloudbreak and Christmas Creek tenements during 2003. The company began constructing port facilities at
Port Hedland in February 2006, followed by a $3.2 billion capital raising in August 2006 to finance its projects. Fortescue began mining at Cloudbreak in October 2007. Iron ore production at the mine began in 2008 and in its first full year of operation the mine produced 28 million tonnes of iron ore. The ore from the mine is processed on site before being loaded onto rail. The product is then transported to the coast at Port Hedland via the
Fortescue railway, where it is loaded onto ships. Construction on the long line from Cloudbreak to the Herb Elliott Port at Port Hedland began in November 2006. The line was scheduled to be fully operational within 18 months. A cyclone in March 2007 killed two workers at the project and lead to delays. The first train from the mine to the port travelled on 5 April 2008. The mine's workforce is on a
fly-in fly-out roster. FIFO arrivals and departures take place at
Fortescue Dave Forrest Airport, approximately away. The hubs' (Cloudbreak and Chichester combined) annual production rate, , is 90 million tonnes of iron ore. Instead, Fortescue decided to develop its Christmas Creek deposit, at a cost of US$360 million, by building a mine and process plant there and linking it to its existing rail network. Christmas Creek is scheduled to produce 16 million tonnes of iron ore in its first year of operation. Fortescue plans to reach an annual production of 95 million tonnes of iron ore by 2012, downgraded from an earlier target of 120 million. Mining at Cloudbreak was temporarily suspended on 24 December 2010 after a
fatality as a sign of respect and to ensure the safety of the workers. Approximately 1,500 workers at the mine had to be evacuated in October 2013 after a large
bushfire threatened the accommodation village near the mine. The workers were taken to Christmas Creek mine until the danger had passed. No injuries or damage was caused to the minesite by the fire which was eventually contained. In 2025 FMG began building a 190 MW
solar park near the mine. ==Environmental approval==