Construction of the new ESB owned 400 MW CCGT power station commenced in 2002 by the EPC consortium group of GE and VA Tech Hydro of Austria. The station entered commercial operation in June 2005. The station consists of a 260 MW General Electric 9FA+e gas turbine, a 140 MW Alstom steam turbine and Standard Fasel heat recovery steam generator (HRSG). Actual power output depends on atmospheric conditions, such as temperature and humidity. The gas turbine runs primarily on natural gas but can also operate on ultra low sulphur diesel in case of disruption of the gas supply. Electricity is generated at 15.75 kV and then transformed up to 275 kV by step-up transformers to match the
Northern Ireland Electricity Networks (NIEN) transmission system. This high voltage electricity is transferred by underground cables to existing outgoing feeder connections in an adjacent NIEN substation. The primary connection to the wider grid is through a double circuit 275kV overhead tower line, which runs to a grid connection in Magherafelt. ==See also==