In 2016, the
state government proposed to restructure the intersection on the Copper Coast Highway at the north end of the
Yorke Highway to provide a large roundabout instead of Yorke Highway terminating at a tee-junction. The roundabout is intended to reduce delays at the end of holiday periods when many people try to drive back towards Adelaide at the same time, and will permit
road trains to operate between
Port Wakefield and
Ardrossan which had previously not been permitted due to limitations of that intersection. Subsidiary works improved the Yorke Highway north of Ardrossan with a widened bridge, sealed shoulders and overtaking lanes. Road trains up to were previously permitted to operate on the
Augusta Highway through Port Wakefield north towards
Port Pirie and beyond, and from Ardrossan south to
Port Giles, but were not permitted to operate north of Ardrossan to the Augusta Highway, limiting the capacity to transport grain or minerals. Work commenced on the roundabout in October 2017 and it was completed in January 2018. A proposal by the
Liberal Party of Australia before the
2018 state election was that if it was elected it would build a single lane overpass at the Port Wakefield end of the Copper Coast Highway to reduce traffic conflicts. The party won the election and upgraded the planning to completely grade-separate the intersection. The contract for detailed design and construction of duplication of the highway through Port Wakefield and a grade-separated intersection with the
Augusta and
Port Wakefield Highways was let in March 2020 to the Port Wakefield to Port Augusta Alliance (a consortium of
CPB Contractors,
Aurecon and
GHD Group, also responsible for the duplication of
Joy Baluch AM Bridge in
Port Augusta), with the government announcing an overpass for the intersection with the Augusta and Port Wakefield Highways in 2021. Project construction commenced in late 2020, with completion expected in 2022; ==Major intersections and towns==