Dahanu Thermal Power Station (DTPS) is a 500 MW (2 X 250 MW) coal-based thermal power station. The power plant was commissioned in 1995. DTPS is the first power utility to get both
ISO 9000 and
ISO 14001 certificates in India.
Electrostatic precipitators (ESP) are installed to collect
fly ash and minimize emissions to the atmosphere. DTPS has installed a 275.34 m
stack to ensure better dispersion of
particulate matter. The stack has a diameter of 31.5 m at the bottom and a diameter of 16 m at the top, with two separate
flues of 5.25 m diameter at the bottom and 4.75 m diameter at the top for each unit. This is the highest stack in Asia ==Geography==