Jayakwadi project is a multipurpose project. The main purpose was to irrigate land for agriculture in the drought prone Marathwada region of Maharashtra state. Other important purpose was to provide water for drinking and industrial usage to nearby towns and villages and to the municipalities and industrial areas of Chhatrapati Sambhajinagar and Jalna. 80% of water of dam is allocated for irrigation, 5-7% for drinking water and the rest for industrial purposes. The average daily discharge of the dam is around 1.36 MCM, of which 0.05 MCM of water is supplied to the MIDC area, 0.15 MCM is distributed to fulfill the needs of Sambhajinagar, while the remaining amount is lost in evaporation.
Irrigation The Jayakwadi project is one of the largest irrigation projects in Maharashtra of India . Through its canal system, the dam irrigates cultivable area of 237,452 hectares in the districts of Chhatrapati Sambhajinagar, Jalna, Beed, Ahmednagar and Parbhani. The length of left bank canal is 208 km, the length of right bank canal is 132 km, commanding a total area is 183,858 hectares. The gross irrigated area by 96,000 hectares under right bank canal was further enlarged by constructing
Majalgaon Dam which acts as a balancing reservoir in addition to harness the Sindphana tributary of the Godavari river.
Electricity generation A hydroelectric power plant of 12 MW capacity is installed on the right bank of the river. The water used for power generation is pumped back to the main reservoir from the tail pond using
reversible hydro turbine. During the drought year 2015, the inflows into the reservoir were very meagre due to failure of rains in the catchment area. However nearly 18
tmcft dead storage water available in the reservoir could not be used for the dire needs. With minor external modifications to the exiting reversible hydro turbine unit, most of the dead storage water can be put to use during the drought years by using the hydro power plant for pumping water into the nearby right canal. Water would be released downstream into the tail pond over the spillway (if needed by
siphon pipes). Nearly five km long contour canal at MDDL of the right canal in the reservoir area is constructed to connect the power house area with the right canal intake point. The pen stock of the hydro power unit is extended (less than 100 m long) to connect to the contour canal. The hydro power unit is operated in pumping mode to pump water from the tail pond to the right canal when the reservoir level is below the canal's minimum draw down level (MDDL). The pen stock extension piping is detached when water pumping to the canal is not required to restore its normal power generation when the reservoir level is above the right canal's MDDL ==Flora and fauna==