MarketE03 expressway (Sri Lanka)
Company Profile

E03 expressway (Sri Lanka)

The Colombo–Katunayake Expressway  E03  is Sri Lanka's second E Class highway. The 25.8-kilometre-long (16.0 mi) highway links the Sri Lankan capital Colombo with Bandaranaike International Airport, Katunayake and Negombo. Construction on the highway began in October 2009, and it was opened on 27 October 2013, by former president Mahinda Rajapaksa. The highway has three lanes each way from Colombo to Peliyagoda, and two lanes each way from Peliyagoda to Katunayake, with the width ranging from 26 to 33.5 metres.

History
The contract was awarded to China Metallurgical Group Corporation (MCC) by the Government of Sri Lanka and the agreement was signed on 17 August 2008. The project loan agreements were signed on 6 August 2009 and the construction commenced on 18 August 2009. The expressway was opened on 27 October 2013 by President Mahinda Rajapaksa. ==Interchanges==
Interchanges
• New Kelani Bridge Interchange • Peliyagoda Interchange • Kerawalapitiya Interchange (connect with Outer Circular Expressway) • Ja-Ela Interchange • Katunayake Interchange ==Gallery==
Gallery
File:Birds-Eye Shot of CKE.jpg|Birds-Eye Shot of CKE File:CKE at night.jpg|CKE at night File:CKE EO3.jpg|CKE File:Colombo Katunayake Expressway declared open.jpg|Colombo Katunayake Expressway declared open File:Display Sign on CKE.jpg|Display Sign on CKE File:Electronic Display Sign - CKE.jpg|Electronic Display Sign - CKE File:A road sign in Colombo - Katunayake Expressway, Sri Lanka.jpg|A road sign File:Elevated section of the CKE.jpg|Elevated section of the CKE File:ConstructionE03-January2012-01.JPG|CKE under construction in 2012. ==See also==
tickerdossier.comtickerdossier.substack.com