Falcon Stadium had a natural grass field for its first 44 years, although the sideline areas where teams stood were artificial turf since the 1980s. Prior to the
2006 season, synthetic
FieldTurf was installed at a cost of $750,000. The stadium has been expanded twice, and the 2005 renovation lowered the total seating capacity. Permanent lighting was installed in Falcon Stadium in 2002 at a cost of $500,000, and the video screen at the south end of the field debuted in
2004. A new sound system was also installed for the 2006 season. The scoreboard was removed after the
2015 season, and a new, larger video board measuring tall by wide, with a total surface area of more than . At its installation in
2016, it was the largest in the Mountain West Conference and amongst the service academies. A second video board was also installed behind the northeast stands prior to the 2016 season. ==Events==