FNB Field received a
$45 million renovation ($18 million in
city funding). Originally the renovation was scheduled to begin in 2005. However, problems with the availability of state funding for the project pushed it back to 2008, with the transfer of ownership between the 2007 and 2008 seasons. The renovation project was finished in two phases, with the first phase being completed before Opening Day 2009. The second phase of the project began in August 2009 and was completed prior to Opening Day 2010. The construction for the first phase of the project began in January 2009 and continued into April 2009. The changes and additions to
FNB Field for the 2009 season were: A public plaza and entrance was constructed in the left field corner; a boardwalk surrounding the outfield was constructed between the foul poles; a complete upgrade to the scoreboard; a new left field seating area; an outfield bar complete with drink rails; and new seating underneath the scoreboard; a new outfield wall constructed with static advertisement panels; and a new Operations Building which houses the Senators front offices, ranger, security, first aid and the new box office along with the new Senators souvenir store, concession stand, and public rest rooms. The following is a comprehensive list of the renovation project: • Complete new seating bowl upgrades with individual chair back seats replacing the bench seating • Roofing covering the majority of the seating bowl • Construction of 20 suites with amenities including a glass wall located in the front of the suite to see the field and a in the back of the suite to see the city skyline • A new sound system • Creation of a "Midway" with activities and specialty areas geared towards children, teenagers and families • Completion of new concessions and restrooms on elevated concourses • Upgraded picnic areas which effectively double the size of the stadium picnic facilities • Reconfiguration of field lights including removal of two lights, addition of fixtures to remaining eight lights, re-lamp and re-aim of all lights, addition of quartz lighting bank for emergency purposes • Upgrade of the field-level concourse with brick pavers • Completion of the Operations Building by August 2009 • New press box including new media and scoreboard control rooms • Complete renovation of existing buildings, including the home and visitors clubhouses and the restroom facilities • Development of a reserved parking lot. The total construction costs for the project were $32 million and the total development budget for the entire project, including all costs, was approximately $45 million. Prior to the 2005 season, a new playing surface was installed which is also a part of the $45 million total project cost. In the 2008 off-season, the renovation of the stadium began, with $500,000 in funding going towards a new public plaza, and other small amenities to be built into the stadium. In the 2009 offseason, the rest of the stadium was renovated. ==Stadium dimensions==