Proposed new line between Gadag Junction and Yalvigi In August 2017, the Ministry of Railways sanctioned 56 km of rail line between Gadag Junction and
Yalvigi. The final location survey for the new line between Gadag - Yelvigi (58 km) is in progress. As per SWR website the route alignment of the new line will be from Gadag-Binkadkatti (existing double line) towards Binkadakatti to Yalavigi via
Harti (Gadag district),
Shirahatti &
Lakshmeshwara. Karnataka State Government has to start Land Acquisition Process after Final Location Survey Completion.
Proposed new line between Gadag Junction and Wadi Junction In 2013–14, the Ministry of Railways sanctioned 252 km of rail line between Gadag Junction and .
RET survey for new line (updating) between Gadag Junction to Harapanahalli (93 km) The physical survey is completed and a report is under preparation.
Reconnaissance engineering cum traffic survey between Gadag Junction and Krishna (216 km) There was a survey for conducting reconnaissance engineering cum traffic survey for new line between Gadag to Krishnar via Kotumachagi, Naregal,
Gajendragarh, Hanumapur, Ilkal and Lingasugur (216 km). == Rail line doubling & electrification works ==