Line 1 Line 1 was approved for construction on 6 May 2013, and approved for plan in 2006. The line goes through
Guanshanhu,
Yunyan,
Nanming and
Huaxi Districts. The line twice crosses Nanming River and connects the downtown area with a number of outlying districts. The line depots are Xiaohe Depot and Guanshanhu Depot. including 30 underground stations and 2 elevated stations. Line 2 runs north to southeast. It opened on April 28, 2021.
Line 3 The first phase of Line 3 is 43.03 km in length and has 29 stations. Line 3 runs from northeast to south. It opened on 16 December 2023. including a 22.64 km underground section and 7.68 km elevated section. ==Lines under construction==