MarketLine 6 (Ningbo Rail Transit)
Company Profile

Line 6 (Ningbo Rail Transit)

The Line 6 of Ningbo Rail Transit is a rapid transit line in Ningbo, Zhejiang. It starts from Gulin to Honglian with 23 stations in operation, spanning 39.6 km long. Construction started on 28 December 2022 with total investment is 31.53 billion RMB.

Stations
All 23 stations are underground. Due to passageway directly connected 2 lines at and not opened, transfer outside the station area is required. If using following QR code channels: Ningbo Rail Transit App, WeChat Pay, Alipay,... passengers must transfer within 30 minutes once exit from one of 2 stations. For passenger using single journey ticket or other IC cards, a "Ride Ticket" can be received when swiping their cards to leave the gate, and continue to the next trip with the "Ticket". OSI: Out of System Interchange ==Commemorative Products==
Commemorative Products
To celebrate Line 6 opened on 16 January 2026, Ningbo Rail Transit sold limited-edition commemorative tickets. Each person can only buy 2 sets, with each set consisting of 2 commemorative tickets, per day. Each ticket has only 15 rides total. In parallel with sold commemorative ticket sets, Ningbo Rail Transit also sold building blocks which look similar to the appearance of the Line 6 train. The building blocks are divided into 2 sets: Mini train and Small train. == References ==
tickerdossier.comtickerdossier.substack.com