The
Heritage Valley Transit Centre, operated by the
Edmonton Transit Service, is located on the north side of Ellerslie Road west of 127 Street. The transit centre has climate controlled waiting shelters, washrooms, drop off areas, and 1,100 park and ride stalls. While the $30 million transit centre was completed in December 2019, the first bus to the transit centre (route 700) arrived on November 30, 2020. The transit centre was designed to be expandable to have up to 20 bus bays and an increased park and ride capacity of 1,900 stalls in the future. The transit centre is designed to integrate into future Capital Line LRT expansion slated for Heritage Valley. The following bus route(s) serve the transit centre: == Surrounding areas ==