Bids for the construction of the ship were open to application and submission at the State Trading Centre. After processing through the STC, the bids were to be submitted dually to the Ministry of Justice and Ecclesiastical Affairs and the ICG. 15 bids were received from 12 countries. The winning bid was the second bid of ASMAR, Chile's largest shipbuilding corporation. The contract for the construction of the new vessel was signed on 20 December 2006 by Björn,
Árni M. Mathiesen,
Minister of Finance, and
Georg Kr. Lárusson, Director of the ICG, and Carlos Fanta de la Vega, Rear Admiral of the
Chilean Navy and Director of the ASMAR Naval Shipyard. Construction commenced on 16 October 2007. The ship was launched on 29 April 2009 at a ceremony in the ASMAR Naval Shipyard in Talcahuano. The then-unnamed vessel received the official name
Þór, or
Thor, after the
god Thor. The vessel is powered by two Rolls-Royce Marine
Bergen diesel engines. The ship's propellers are two Rolls-Royce Marine KaMeWa Ulstein
feathering propellers (feathering propellers are rotated parallel to the water flow in order to reduce drag). The ship is
long overall, a wide, and a has a height of . The maximum speed of the vessel is , while its towing capacity, or bollard pull, is . The cargo deck covers . The vessel is outfitted with various life-saving equipment, designed to aid it in rescue missions, including two
MOB boats and six Viking
life rafts. Other specially designed equipment the vessel is outfitted with includes
oil booms, one
40 mm Bofors gun, and
oil skimmers.
2010 tsunami incident ; President of Iceland, Mr.
Ólafur Ragnar Grímsson; and former Minister of the Interior,
Ögmundur Jónasson; welcomes Þór to Reykjavík. In 2010, a
magnitude 8.8
earthquake struck Chile, forming an immense
tsunami that left a deadly wake along the Chilean coastline. It was feared that ICGV
Þór would have been damaged beyond repair in the disaster, as the shipyard itself was known to have incurred massive damage. Despite the odds, the ship had sustained minimal damage. After being placed in
dry dock for minor repairs, the vessel was delivered, albeit more than a year late. ==Delivery==