and
Stripped Classical style The Head Office of the Ministry was in the Vogel Building in Wellington, named after former Premier Sir
Julius Vogel, who helped create the Public Works Department during his term in office, through the
Immigration and Public Works Act 1870. This building held the
Vogel Computer, one of the largest in New Zealand and used by several government departments for engineering work. The Ministry moved to the Vogel Building in about 1966 from the
Old Government Building on Lambton Quay. During the
Great Depression the department was relied on by the government to provide unemployment relief, constructing infrastructure mostly using human labour at reduced salaries. The
First Labour Government resumed the department's original function as the development arm of the state although from May 1936 (when a new three year public works programme was announced) whence relief work for the unemployed not only continued but all relief workers were placed on the standard £4 a week rate of pay. The ministry was renamed the
Ministry of Works on 16 March 1943 under the
Ministry of Works Act. This was to reflect the extended wartime functions, when the Minister explained it was, "to ensure that, whilst the building and constructional potential of the country is limited by war and immediate post-war conditions, it is assembled and utilized in the most efficient manner from the point of view of the national interest". In 1944 the ministry was involved in the "great furniture scandal" when asked to order items of furniture for the new Legation in Moscow, to be headed by
Charles Boswell. The list of items to be shipped from New Zealand to Moscow (via Tehran and Central Asia) included 40 armchairs, 10 couches, a billiard table, and palm stands. Apparently made after looking at furniture in Government House and ministerial houses, the order could have seated almost the entire House of Representatives; it was cancelled by Prime Minister
Peter Fraser. During the latter years of the Ministry there were seven District Offices (Auckland, Hamilton, Wanganui, Napier, Wellington, Christchurch and Dunedin) each headed by a District Commissioner of Works. In each District there were a number of Residency Offices (headed by a Resident Engineer) and each had a number of Depots. The primary purpose of this 6000 strong workforce was the maintenance of the existing and planning and construction of replacement sections of the State Highway network. In addition there were Project Offices set up for a particular purpose, such as to build a power project, airport, tunnel or irrigation scheme. ==Dissolution==