Costs The rivers inter-linking feasibility reports completed by 2013, suggest the following investment needs and potential economic impact: • The cost conversion in US $ is at latest conversion price on the historical cost estimates in Indian rupees
Ecological and environmental issues Some activists and scholars have, between 2002 and 2008, questioned the merits of Indian rivers inter-link projects, and questioned if appropriate study of benefits and risks to environment and ecology has been completed so far. Bandyopadhyay et al. claim there are knowledge gaps between the claimed benefits and potential threats from environment and ecological impact. Other scholars have asked whether there are other technologies to address the cycle of droughts and flood havoc's, with less uncertainties about potential environmental and ecological impact. Rivers may change their courses every (approximately) 100 years, so the interlinking may not be useful after 100 years. Interlinking may also lead to deforestation and cause ecological imbalances, widely expected to alter fish communities. A study concluded that the project could reduce rainfall and change rainfall patterns in the region.
Displacement of people and fisheries profession Water storage and distributed reservoirs are likely to displace people – a rehabilitation process that has attracted concern of sociologists and political groups. Further, the inter-link would create a path for
aquatic ecosystems to be affected by movement of species from one river to another, which in turn may affect the livelihoods of people who rely on specific aquatic species for their income. Lakra et al., in their 2011 study, claim large dams, interbasin transfers and water withdrawal from rivers is likely to have negative as well as positive impacts on freshwater aquatic ecosystem. As regards to the impact on fish and aquatic
biodiversity, there could be positive as well as negative impacts.
Poverty and population issues India has a growing population, and large impoverished rural population that relies on monsoon-irrigated agriculture. Weather uncertainties, and potential climate change induced weather volatilities, raise concerns of social stability and impact of floods and droughts on rural poverty. The population of India is expected to grow further at a decelerating pace and stabilize around 1.5 billion by 2050, or another 300 million people – the size of United States – compared to the 2011 census. This will increase demand for reliable sources of food and improved agriculture yields – both of which, claims India's National Council of Applied Economic Research, require significantly improve irrigation network than the current state. The average rainfall in India is about 4,000 billion cubic meters, of which annual surface water flow in India is estimated at 1,869 billion cubic meters. Of this, for topological and other reasons, only about 690 billion cubic meter of the available surface water can be utilised for irrigation, industrial, drinking and ground water replenishment purposes. In other words, about 1,100 billion cubic meter of water is available, on average, every year for irrigation in India.
International issues In a 2007 article the authors claim inter-linking of rivers to initially appear to be a costly proposition in ecological, geological, hydrological and economical terms, but in the long run the net benefits coming from it will far outweigh these costs or losses. However, they suggest that there is a lack of an international legal framework for the projects India is proposing. In at least some inter-link projects, neighbouring countries such as Bangladesh may be affected, and international concerns for the project must be negotiated.
Technological developments Cost of power generation by
solar power projects would be below Rs. 1.0 per Kwh in few years. Availability of cheaper, clean and perennial/renewable power would favour more water lifting/pumping and tunnels in the river link projects rather than purely gravity links to economize on cost, reduce construction time and reduce land submergence by optimum use of existing reservoirs/less storage, etc.
Tunnelling technology/methodology has also undergone drastic improvements which makes it an alternative choice to open gravity canal links, with shorter distance and cost effective.
Political views BJP-led
NDA government of
Atal Bihari Vajpayee had propagated the idea of interlinking of rivers to deal with the problem of drought and different parts of the country at the same time.
Karunanidhi, whose
DMK has been a key ally of the Congress-led
UPA at the centre, wrote that linking rivers at the national level perhaps is the only permanent solution to the water scarcity problem in the country. Karunanidhi said the government should make an assessment of the project's feasibility starting with the south-bound rivers.
DMK for 2014 general elections added Nationalisation and inter-linking of rivers to its manifesto.
Kalpasar Project is an irrigation project which envisages storing
Narmada River water in an offshore freshwater reservoir located in
Gulf of Khambhat sea for further pumping to arid
Saurashtra region for irrigation use. ==Plan==