The IRR Transversal Line or the Haditha–Kirkuk Railway is a railway line of the Iraqi Republic Railways that connects Haditha and Haqlaniyah with Kirkuk via Baiji. It is a single-track unelectrified line. The railway is about 252 km (157 mi) long and has a maximum travel speed of 100 km/h (62 mph). Unlike other Iraqi rail lines, it does not end at Baghdad. At present, the railway line is only operational for freight transport between Haditha and Baiji. However, the damaged truss-bridge over the Tigris has halted the resumption of services to Kirkuk. The railway's state is notably deteriorated, reflecting the widespread disrepair of Iraq's rail infrastructure.