The airport's ground transportation is developing very fast. Four highways around the airport are either under construction or have been built, as part of plans to turn Chongqing into an integrated regional transport hub in western China. There is a GTC (Ground Transportation Centre) in front of T3A's main terminal building, providing transfer to inter-city rail, metro, buses, long-distance coach and taxis. General plan of integrated transportation Hub at Chongqing Jiangbei International Airport: • One inter-city rail: Branch of Chongqing-Wanzhou Inter-City Rail • Two lines of Chongqing Rail Transit: Line 3 and Line 10 • Three latitudinal roadways: (1) outer ring expressway, (2) relocated National Highway G319, and (3) southern connecting freeway • Four longitudinal roadways: (1) first freeway of CKG Airport (National Highway G210), (2) second freeway of CKG Airport (under construction), (3) Chongqing-Linshui expressway, and (4) northern connecting roadway
Buses Airport express bus routes Airport Express lines are easily accessible at Terminals 2 and 3. • Route K01: Jiangbei Airport → Jiazhou () → Damiao () → Shangqingsi () → Chongqing Great Hall →
Jiefangbei. It takes about 50 minutes from the airport to the city centre (Jiefangbei). • Route K02: Jiangbei Airport → Qixia Road () → North Square of Chongqingbei Railway Station. 40 minutes may be taken from the airport to the High-Speed railway station. • Route K03: Jiangbei Airport → Yanggongqiao (Shapingba) • Route K05: Jiangbei Airport → Sigongli Bus Terminal • Route K06: Jiangbei Airport → Chongqing West Railway Station • Route K07: Jiangbei Airport → Shapingba Railway Station
Long-distance coach services There is a transfer center for long-distance coaches between Terminal 2A and Terminal 2B, and it offers bus services to nearby cities in Sichuan and Guizhou Province, as well as suburban areas of Chongqing Municipality.
Freeways and roads There is currently one airport freeway connecting the city center with the airport, and the second one is under construction and will be put into operation in the late 2016. The airport freeway is 23 kilometers long, but it usually takes as many as 30 minutes to get from the city center to the airport because of the heavy traffic.
Parking The airport has four parking lots: • International (Outdoor) Parking Lot, located in front of Terminal 1 (with certain sections transformed into a
drive-in cinema since March 2022) • Domestic (Outdoor) Parking Lot, located in front of Terminal 2 • Underground (Indoor) Parking Lot, located under Terminal 2 • Central Parking Garage, located in the GTC (Ground Transportation Center) in front of Terminal 3 All together, the airport can accommodate about 7,300 cars at one time.
Chongqing Rail Transit (CRT) , with the Chongqing Jiangbei International airport in the background
Chongqing Rail Transit Line 3 runs from Chongqing Jiangbei International Airport's
Terminal 2 station, going through the city center via
Lianglukou station and onto its final stop,
Yudong, covering a distance of . It takes around 50 minutes to get to the city center (Lianglukou).
Line 10, serves as the second metro line connecting the urban areas of Chongqing and the airport. One station of Line 10
is at Terminal 3 and the other is at Terminal 2. This line runs under Runways #1 (02L/20R) and #2 (02R/20L), connecting Terminal 2 and Terminal 3 in landside. Line 10 is the only metro line access to the new Terminal 3, while Line 3 will not be elongated to Terminal 3. Line 10 also reduces the travel distance between Chongqing Jiangbei International Airport and
Chongqingbei Railway Station, which can facilitate the transfers of passengers between air and rail.
National Railway and Intercity Trains ====
China Railway (Intercity trains)==== Terminal 3A has a large underground railway station as part of its GTC (Ground Transportation Center). It is adjacent to the Chongqing Rail Transit
Line 10 metro station. The railway station opened on 30 December 2022, initially with limited service to stations along the
Chongqing Railway Hub East Ring line, forming the Airport Branch of the railway line. It is one stop away from
Chongqing North railway station, a major railway station servicing Chongqing. The station is designed to connect cities as far as 300 kilometers away, thus allowing Chongqing Jiangbei International Airport to serve a significantly larger population. The speed of the trains is designed to be 250 to 300 kilometers per hour, allowing journeys to take less than one hour from a relatively faraway locations within the Chongqing Municipality. ==Other facilities==