Line 1 Line 1 runs north–south in the western part of the city. The line began operating on 1 April 2019, and cost CN¥12 billion to build. The line began operating on 26 March 2021.
Line 3 Line 3 (Phase 1) is long. It is completely underground. The line began operating on 28 December 2019.
Line 4 Line 4 is long. The line began operating on 27 December 2025.
SkyShuttle Line 1 Jinan SkyShuttle Line 1 runs in a loop in the eastern part of the city. The fully elevated line using a
BYD SkyShuttle automated guideway transit system began operating on 6 December 2025. It is 30.55 km in length with 32 stations. ==Future Development==