Underframe The
underframe of the coach was made entirely of rivetted structural steel. The outer longitudinal beams were U-shaped with outward facing flanges. The crossbeams were also made of U-profiles and not cranked. The wagons had
screw couplings of
VDEV design. The drawbar ran the length of the vehicle and was spring-loaded in the middle. As buffing equipment, the wagons had slotted cylindrical buffers with an installation length of 612 millimetres, the buffer plates had a diameter of 370 millimetres.
Running gear The coaches had riveted half-timbered axle boxes of the short type, made of sheet steel. The axles were housed in sliding axle bearings. The wheels were spoked. Due to the long wheelbase of 5,000 millimetres, standard VDEV radial axles were used. In addition to a screw brake, which was located on one of the platforms at the end of the coach, the coaches also had air brakes of the
Westinghouse system.
Body The frame of the coach body consisted of wooden posts. This was covered with sheet metal on the outside and wood on the inside. The joints of the sheets were covered by cover strips. The roof was gently rounded and extended beyond the open end-platforms. The coaches had folding branch line steps, which were later replaced by normal ones.
Facilities The coach was 3rd class only and had a total of 31 seats and a toilet. A total of 20 standing places were designated for the two end-platforms. The coaches were lit by paraffin lamps and had steam heating. They were ventilated by static ceiling ventilators. == Coach numbering ==