In 2009, work to upgrade the road surface to grade II bitumen class, with shoulders, culverts and drainage channels. The road was divided into two sections: (a)
Busega–
Muduuma, measuring , was contracted to
Spencon Services Limited with Stirling Civil Engineering Limited (b) Muduuma–Mityana, measuring , was contracted to Dott Services Limited. Lea International Limited (Canada) was the supervising contractor for both sections. The road was successfully completed in 2012. ==See also==