Section 1 (Thokar Niaz Baig *Lahore* to Abdul Hakim) Section 1 starts at
Lahore in Thokar Niaz Baig at
M-2. After Ravi Toll Plaza, Section 1 turns to
M-3. Section 1 ends at the junction of M-3 and M-4 just 500 meters away from Abdul Hakeem.
Section 2 (Abdul Hakeem to Sukkur) Section 2 is the longest section of the LKM, being M-4 and M-5 Motorway. Like most of Section 1, most of section 2 was inaugurated in 2019. This section runs from the M-3 junction with M-4 to M-6 in Sukkur. The section is divided into two parts (2A and 2B).
Section 2A (Abdul Hakeem to Multan) Section 2A is one part of Section 2 that runs from M-3 to
Multan. If Section 2A is considered as a separate section, then this is the shortest section of the LKM.
Section 2B (Multan to Sukkur) Section 2B runs from
Multan to Sukkur, fully M-5. This is the longest part of Section 2.
Section 3 (Sukkur to Hyderabad) This section is under construction and is entirely in
M-6. This is the only missing link in LKM. The
Grand Trunk Road and the
Indus Highway are alternatives to Section 3.
Section 4 (Hyderabad to Karachi) This section is the very last section of the motorway and is entirely in
M-9. This section is also known as the Super Highway. M-9 is the shortest section of LKM. == Junctions and exits ==