MarketKazunogawa Pumped Storage Power Station
Company Profile

Kazunogawa Pumped Storage Power Station

The Kazunogawa Pumped Storage Power Station is a pumped-storage hydroelectric power station near Kōshū in Yamanashi Prefecture, Japan. The station is designed to have an installed capacity of 1,600 megawatts (2,100,000 hp) and three of the four 400 megawatts (540,000 hp) generators are currently operational, for a total operational capacity of 1200 MW. Construction on the power station began in 1993 and the first generator was commissioned on 3 December 1999. The second was commissioned on 8 June 2000. The third one became operational on 9 June 2014, six year early due to post-power demand from the Great East Japan earthquake. The fourth and final generator is slated to be commissioned by 2024. It is owned by TEPCO and was constructed at a cost of US$2.2 billion.

Design and operation
The upper reservoir for the power station is created by the Kamihikawa Dam at which is a tall and long rock-fill embankment type. It has a fill volume of . The upper reservoir's capacity is of which is active (or "useful) for power generation. ==See also==
tickerdossier.comtickerdossier.substack.com