• P – producing well • P&A – plug(ged) and abandon(ed) (well) • PA – producing asset • PA – polyamide • PA – producing asset with exploration potential • PACO – process, automation, control and optimisation • PACU – packaged air conditioning unit • PADPRT – pressure assisted drillpipe running tool • PAGA – public address general alarm • PAL – palaeo chart • PALYN –
palynological analysis report • PAR – pre-assembled rack • PAU – pre-assembled unit • PBDMS – playback DMSLS log • PBHL – proposed bottom hole location • PBR – polished bore receptacle (component of a
completion string) • PBD – pason billing system • PBTD – plug back total depth • PBU – pressure build-up (applies to integrity testing on valves) • PCA – production concession agreement • PCB –
polychlorinated biphenyl • PCCC – pressure containing anti‐corrosion caps • PCCL – perforation casing collar locator log • PCDC – pressure-cased directional (geometry i.e. borehole survey) MWD tool • PCE – pressure control equipment • PCDM – power and control distribution module • PCKR – packer • PCMS – polymer coupon monitoring system • PCN – process control network • PCO – pre-commission preparations (pipeline) • PCOLL – perforation and collar • PCP – progressing cavity pump • PCP – possible condensate production • PCP - Production Casing Pressure • PCPT – piezo-cone penetration test • PCS – process control system • PDC – perforation depth control • PDC – polycrystalline diamond compact (a type of drilling bit) • PDG/PDHG – permanent downhole gauge • PDGB – permanent drilling guide base • PDKL – PDK log • PDKR – PDK 100 report • PDM –
positive displacement motor • PDMS – permanent downhole monitoring system • PDP – proved developed producing (reserves) • PDP – positive displacement pump • PDPM – power distribution protection module • PDNP – proved developed not producing • PDR – physical data room • PDT – differential pressure transmitter • PE – petroleum engineer • PE – professional engineer • PE – production engineer • PE – polyethylene • PE – product emulsion • PE – production enhancement • PEA – palaeo environment study report • PED – pressure equipment directive • PEDL – petroleum exploration and development licence (United Kingdom) • PEFS – process engineering flow scheme • PENL – penetration log • PEP – PEP log • PERC – powered emergency release coupling • PERDC –
perforation depth control • PERFO – perforation log • PERM – permeability • PERML – permeability log • PESGB –
Petroleum Exploration Society of Great Britain • PETA – petrographical analysis report • PETD – petrographic data log • PETLG – petrophysical evaluation log • PETPM –
petrography permeametry report • PETRP – petrophysical evaluation report • PEX – platform express toolstring (resistivity, porosity, imaging) • PFC – perforation formation correlation • PFD – process flow diagram • PFD – probability of failure on demand • PFE – plate/frame heat exchanger • PFHE – plate fin/frame heat exchanger • PFPG – perforation plug log • PFREC – perforation record log • PG – pressure gauge (report) • PGC – Potential Gas Committee • PGB – permanent guide base • PGOR – produced gas oil ratio • PGP – possible gas production • PH –
phasor log • PHASE – phasor processing log • PHB – pre-hydrated bentonite • PHC – passive heave compensator • PHOL – photon log • PHPU – platform hydraulic power unit • PHPA –
partially hydrolyzed polyacrylamide • PHYFM – physical formation log • PI – productivity index • PI – permit issued • PI – pressure indicator • P&ID –
piping and instrumentation diagram • PINTL – production interpretation • PIP – pump intake pressure • PIP – pipe in pipe • PIT – pump intake temperature • PJSM – pre-job safety meeting • PL – production license • PLEM – pipeline end manifold • PLES – pipeline end structure • PLET – pipeline end termination • PLG – plug log • PLR –
pig launcher/receiver • PLS – position location system • PLSV – pipelay support vessel • PLT –
production logging tool • PLTQ – production logging tool quick-look log • PLTRE – production logging tool report • PLQ – permanent living quarters • PMI – positive material identification • PMM – permanent magnet motor • PMOC – project management of change • PMR – precooled mixed refrigerant • PMV – production master valve • PNP – proved not producing • POB – personnel on board • POBM – pseudo-oil-based mud • POD – plan of development • POF – permanent operations facility • POH – pull out of hole • POOH – pull out of hole • PON – petroleum operations notice (United Kingdom) • POP – pump-out plug • POP – possible oil production • POP – place on production • POR – density porosity log • PORRT – pack off run retrieval tool • POSFR – post-fracture report • POSTW – post-well appraisal report • POSWE – post-well summary report • PP – DXC pressure plot log • PP – pump pressure • PPA – Pounds of Proppant added • PP&A – permanent plug and abandon (also P&A) • ppb – pounds per barrel • PPC – powered positioning caliper (Schlumberger dual-axis wireline caliper tool) • ppcf – pounds per cubic foot • PPD – pour point depressant • PPE – preferred pressure end • PPE – personal protective equipment • ppf - Pounds Per Foot • PPFG – pore pressure/fracture gradient • ppg – pounds per gallon • PPI – post production inspection/intervention • PPI – post pipelay installation • PPL – pre-perforated liner • – pounds (per square inch) per thousand feet (of depth) – a unit of fluid density/pressure • PPS – production packer setting • PPU – pipeline process and umbilical • PQR – procedure qualification record • PR2 – testing regime to API6A annex F • PRA – production reporting and
allocation • PREC – perforation record • PRESS – pressure report • PRL – polished rod liner • PRV – pressure relief valve • PROD – production log • PROTE – production test report • PROX – proximity log • PRSRE – pressure gauge report • PSANA – pressure analysis • PSA – production service agreement • PSA – production sharing agreement • PSC – production sharing contract • PSD – planned shutdown • PSD – pressure safety device • PSD –
process shutdown • PSD – pump setting depth • PSE – pressure safety element (rupture disc) • PSIA – pounds per square inch atmospheric • PSIG – pounds per square inch gauge • PSL – product specification level • PSLOG – pressure log • PSM –
process safety management • PSP – pseudostatic spontaneous potential • PSP – positive sealing plug • PSPL – PSP leak detection log • PSSR –
pre-startup safety review • PSSR – pressure systems safety regulations (UK) • PSQ – plug squeeze log • PST – PST log • PSV – pipe/platform supply vessel • PSV – pressure
safety valve • PSVAL – pressure evaluation log • PTA/S – pipeline termination assembly/structure • PTO – permit to sperate • PTRO – test rack opening pressure (For a gas lift valve) • PTSET – production test setter • PTTC – Petroleum Technology Transfer Council, United States • PTW – permit to work • PU – pick-up (tubing, rods, power swivel, etc.) • PUD – proved undeveloped reserves • PUN – puncher log • PUR – plant upset report • PUQ – production utilities quarters (platform) • PUWER –
Provision and Use of Work Equipment Regulations 1998 • PV – plastic viscosity • PVDF – polyvinylidene fluoride • PVSV –pressure vacuum safety valve • PVT – pressure volume temperature • PVTRE – pressure volume temperature report • PW – produced water • PWD – pressure while drilling • PWB – production wing block (XT) • PWHT – post-weld heat treat • PWRI – produced water reinjection • PWV – production wing valve (also known as a flow wing valve on a
christmas tree) ==Q==