The station consists of the following units: • Unit 2 is a 420 MW unit operated and owned by TransAlta. • Unit 3 is a 463 MW unit, built as a joint venture between TransAlta and
Capital Power Corporation. It came onstream in 2011. In 2019, TransAlta acquired full ownership of the unit. This unit is a
supercritical boiler manufactured by Hitachi. The unit cost about $1.98 billion to build. Unit 1 was retired on December 31, 2021. The plant has two 138.6 m (455 ft) smokestacks. == See also ==