Two bridges span the Bassac river to the capital in the district's north, and one bridge in the south connects to
Takhmao Municipality. The
Monivong Bridge on National Road 1 connects
Sangkat Cbhar Ampov I to
Khan Chamcarmon, while the
Koh Pich-Koh Norea Bridge which opened October 2023 links the nascent
Koh Norea island development to
Koh Pich in Sangkat
Tonle Basak. The
Cambodia-China Friendship Takhmao Bridge connects National Road 1 to National Road 2. Construction of a fourth bridge, the
Chak Angre Krom-Prek Pra Bridge (formerly named the Prek Talong bridge), was inaugurated in February 2024. The bridge will connect Sangkat Prek Pra to Chung Kong Boulevard in Sangkat Chak Angre Kraom, Mean Chey district. The boulevard will eventually extend from Chamkar Doung Road in
Dangkao district to National Road 1 in Sangkat Veal Sbov, Chbar Ampov. == Development ==