The company operates the Al Jaili
oil refinery 70 kilometers north of Khartoum. The capacity of the refinery is 100,000 barrels of oil per day. Excess petroleum is exported from Bashair Port on the Red Sea through a pipeline of 1610 km length, making it the longest pipeline in Africa. The facility has been non-operational since July 2023 due to the
Sudanese civil war (2023–present), which has seen the facility attacked several times. A new operation by the
Sudanese Armed Forces (SAF) to capture the facility in January 2025 caused a fire to engulf the facility. The SAF claimed that the
Rapid Support Forces (RSF) set fire to the factory, while the Rapid Support Forces said the Sudanese Air Force caused the fire by dropping
incendiary barrel bombs in the area. On 24 January, the Sudanese army had retaken the oil refinery facility from RSF. ==References==