On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the KIAL Terminals metro station, part of the 15.011 km Reach 2B – Package 3 (Bagalur Cross - KIAL Terminals) of the 37.692 km
Blue Line of
Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd.
(NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. ==Station layout==