In October 2003, Gloucester Rugby launched 'Project Kingsholm'. 'The Kingsholm Supporters Mutual' (KSM) was set up by Gloucester Rugby Football Club in October 2003, to help fundraise towards 'Project Kingsholm', the redevelopment of Gloucester's entire ground at a cost of £6,000,000, and the launch of a supporters shares rights issue. The idea was to be similar to the development at
Franklin's Gardens, home of
Northampton Saints, although on a bigger scale, incorporating both seating and terracing. Despite the KSM meeting the fundraising targets, Gloucester Rugby abandoned all plans. In 2006, the club announced it would be making an extension to Kingsholm, bringing the stadium capacity up to 16,500. This was mainly to comply with Premier Rugby's minimum seat number requirements. The old main Grandstand (which was both terracing and seating) was later replaced by a new all seater structure, while terracing on the Worcester Street end of the ground was developed into an all seater stand, known as the 'Buildbase' stand at the time. In January 2007, the club announced plans to redevelop The Shed terracing to all seater. This was intended to enable the entire stadium to become all-seating. A large number of supporters did not want to see this happen under the proposals put forward by Gloucester Rugby, and a poster campaign under the name of 'Save Our Shed' or 'SOS' was initiated by the KSM, and sponsored by the
Gloucester Citizen newspaper. Posters were held up by supporters standing in the Shed, on camera during a televised
Heineken Cup match against
Leinster Rugby at Kingsholm. T-shirts were also made independently by supporters, with the slogan 'Save Our Shed' printed on them. The campaign did not protest the redevelopment of the Shed, rather the plans put forward at the time which were to replace all terracing with seats, leaving no alternative anywhere in the ground, despite such a large demand for terracing. In September 2008, chairman
Tom Walkinshaw confirmed there were plans for the Shed to be redeveloped, but it would remain as a terrace (with an increased capacity of 6000), with hospitality units above it. However, as of the 2010/11 season, the need and desire for redeveloping the Shed decreased with the above-mentioned plans proving to be conjecture, and as such abandoned, have never come into effect and do not appear to for the foreseeable future. In 2007, the club reject the proposal of moving to a brand new 15,000 capacity community stadium in an area of the city nicknamed 'The Railway Triangle' off Metz Way. This deal was superseded in 2021 by a new deal with medical supplier
Compeed meaning the stand became
The Compeed Shed ahead of the 2021–22 season. A new
artificial surface was also laid ahead of the 2021–22 season. ==References==