MarketKL Monorail
Company Profile

KL Monorail

The KL Monorail Line is the only operational monorail system in Malaysia. Operated as part of the Rapid KL system by Rapid Rail, a subsidiary of Prasarana Malaysia, it is one of the components of the Klang Valley Integrated Transit System. The line is numbered 8 and coloured light green on official transit maps. It is the only line in the system that is completely within the boundaries of the Federal Territory of Kuala Lumpur.

History
This urban monorail line was opened on 31 August 2003, with 11 stations running on two parallel elevated tracks. It connects the KL Sentral transport hub in the south and Titiwangsa in the north with the "Golden Triangle", a commercial, shopping, and entertainment area consisting of the Bukit Bintang area, and surrounded by Jalan Imbi, Jalan Bukit Bintang, Jalan Sultan Ismail, and Jalan Raja Chulan. The monorail scheme was announced by Kuala Lumpur City Hall in January 1990 after the Malaysian Government gave the go-ahead to the scheme at a cabinet meeting in June 1989. Its cost was then estimated at RM 143 million. The , 22-station system is designed to carry more than 34,000 passengers a day on a 20-minute loop through Kuala Lumpur's bustling commercial core. The plan is to build it in two phases: in the first, 16 stations will be served over ; and in the later stage, another loop will be added. The first phase was expected to be completed within two years. According to plans dating back to the 1990s, the planned line was to have two branches (similar to the Ampang and Sri Petaling Lines), with one branch going via Maharajalela station and then on to the city centre, and the other branch going to , , Jalan Klang Lama and ending at Kampung Pasir, which will probably include integration with KTM Komuter's at or stations. KL Sentral and Tun Sambanthan were planned to be the common stations. Ultimately only the downtown branch was built, due to the 1997 Asian financial crisis. While another plan from Kuala Lumpur People-Mover Rapid Transit (PRT), under the "Kuala Lumpur Linear City" development plan, depicts that the project will include building of twin track monorail guideway beams, 20 elevated stations, two depots and 14 monorail trains. There will be two phases to the project's construction. Between Jalan Tun Razak and Brickfields, Section 1 will span approximately 8 kilometres, while Section 2 would connect Tun Sambanthan and KL Sentral Station via a 12-stop shuttle service. Section 2, which is unfinished and spans , begins in Brickfields and travels via Kampung Abdullah Hukum, Lembah Pantai, Pantai Dalam, Taman Desa, OUG, and finally ends at Kampung Pasir. KL PRT Sdn Bhd would oversee the project management while carrying out the PRT transport system's construction, upkeep, and operation during the course of a 30-year concession. The PRT system planned to accommodate up to 18,000 passengers per hour per direction (pphpd) with 168 seats in each train and 630 passengers per train at a headway of up to two minutes between trains. The first section of the project, which runs between P. Ramlee Station and Hang Tuah Station, was supposed to be finished in time for trial runs during the Commonwealth Games in September 1998. Construction on the project started in December 1996 and Sections 1 and 2 were scheduled to be finished in early 1999 and 2000 respectively. Work was scheduled to begin in June 1990, but was postponed to May 1991 after the city's mayor complained that tenders submitted for preparatory work were too high. There has been no activity on the project since and few details are available on how the project is expected to proceed. The main contractor is a local company, BNK, which had little success in its search for backers to finance its share of the venture. Part of its problem in securing money stems from the project's escalating cost estimates, and part from its lack of a track record in handling such huge projects. The line and number of stations remains unchanged since 2003. Based on the 1999 transit map, the KL Monorail line originally had 19 stations, starting from Titiwangsa, Chow Kit, Wawasan, P. Ramlee, Raja Chulan, Bukit Bintang, Imbi, Hang Tuah, Merdeka, Sultan Sulaiman (cancelled), Tun Sambanthan, and a subsequently unbuilt extension which consisted of stations in Syed Putra, Taman Seputeh, Abdullah Hukum, Lembah Pantai, Pantai Dalam, Taman Desa, OUG and Kampung Pasir. Since the start of operations, the KL Infrastructure Group suffered losses, largely due to depreciation and interest repayment costs. On 30 April 2004, KL Infra posted a net loss of MYR 46.24 million on a MYR 15.08 million revenue. KL Infra had also taken up a MYR 300 million Malaysian government loan and a MYR 260 million infrastructure loan from the Bank Pembangunan Malaysia Berhad (BPMB) (The development bank of Malaysia) (, BPM). In addition, KL Infra had proposed to buy MTrans' three subsidiary companies to improve its business, but failed after Scomi bought up some of the targeted companies. SPN gave its agreement in principle to the takeover on 22 December 2006 and a follow-up meeting was held on 6 February 2007 with the government on the takeover of its operational assets and assumption of loan liabilities. A due diligence audit was conducted from 5 March 2007 to 27 April 2007 by consultants appointed by the government. Following agreement to the takeover, BPM granted KL Monorail an extension until 29 April 2007 for an interest repayment amounting to MYR 4,244,801.91, which was originally due on 29 December 2006. However, the takeover seemed to have suffered a setback at least from the perspective of KL Infra when on 26 March 2007, it was notified by BPM that it was not going to entertain any further extensions for interest repayment. Subsequently on 27 April 2007, the bank notified that it would not be granting any moratorium on interest repayments. On 29 April 2007, KL Monorail was not able to make the repayment of the interest instalment which had become due. One of the effects of the appointment of receivers and managers is the possibility that KL Infra would not be receiving any compensation for KL Monorail should the takeover by SPN have gone through. The trading of KL Infra was suspended from 15 May 2007. On the same day, KL Infra's board announced to Bursa Malaysia that it had formed the opinion that it was not solvent and would not be able to pay all its debts in full within a period not exceeding twelve months. On 28 November 2007, Prasarana Malaysia signed a sale-and-purchase agreement with KL Monorail Systems, effectively making Prasarana the operator of KL Monorail, and resulting in Prasarana taking over the MYR 882 million BPM loan. ==List of stations==
List of stations
The line consists of a single dual-way line that links areas of inner Kuala Lumpur not served by rail transport, namely Brickfields, Bukit Bintang, and Chow Kit, with existing LRT, MRT, ERL and KTM Komuter stations at KL Sentral, , , , , , and . The two termini are on a single track with a Spanish solution layout. The stations are designed as elevated structures with ticketing facilities on either the ground level (as seen in the KL Sentral station) or the first-floor level. The platforms are on the top floor, separated from the monorail lines by fencing. They were originally covered by large canvas roofs, which were replaced in 2014 by aluminium zinc roofs. Certain stations are situated above roadways, or are slightly longer than others. Each station used to be designated with a sponsor, with route maps associating each station with a particular product brand. The depot is between KL Sentral and Tun Sambanthan. [ { "type": "ExternalData", "service": "geoline", "ids": "Q1790833", "properties": { "stroke": "#7dba00", "stroke-width": 6 } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.687994, 3.132582] }, "properties": { "title": "MR1 KL Sentral", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.690880, 3.131480] }, "properties": { "title": "MR2 Tun Sambanthan", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.699147, 3.138957] }, "properties": { "title": "MR3 Maharajalela", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.706026, 3.140765] }, "properties": { "title": "MR4 Hang Tuah", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.709446, 3.142808] }, "properties": { "title": "MR5 Imbi", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.711474, 3.146097] }, "properties": { "title": "MR6 Bukit Bintang", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.710441, 3.150882] }, "properties": { "title": "MR7 Raja Chulan", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.704868, 3.156108] }, "properties": { "title": "MR8 Bukit Nanas", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.698921, 3.159289] }, "properties": { "title": "MR9 Medan Tuanku", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.698398, 3.167394] }, "properties": { "title": "MR10 Chow Kit", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } }, { "type": "Feature", "geometry": { "type": "Point", "coordinates": [101.695950, 3.173229] }, "properties": { "title": "MR11 Titiwangsa", "marker-symbol": "rail-metro", "marker-size": "small", "marker-color": "#7dba00" } } ] Expansion To some extent, the line has been designed to accommodate future expansion. While some stations are significantly longer than the former 2-car trainsets, providing room for longer trainsets, extension works for other stations have been necessary. An expansion project known as the KL Monorail Fleet Expansion project is being carried out by Prasarana to ensure a more efficient and user-friendly monorail services in the future. The installation of the Platform Automatic Gate System (PAGS) is one such work under the project. This gate system is necessary to improve passenger safety as before this, there are no barriers between the passenger platforms and the tracks and this may pose dangers to the users. The project also includes the installation of a new signalling system, construction of a new depot to accommodate larger train sets, and other station upgrades and universal access facilities. An example of station upgrades is at Bukit Bintang station. Touted as one of the busiest stations of the line due to its proximity to Bukit Bintang, the hub of shopping and entertainment in Kuala Lumpur, it used to have only one exit, but the upgrading project now provided the station with added an alternative entrance and exit walkway and a direct entry to the Lot 10 and Sungei Wang Plaza shopping complexes. The monorail station is also equipped with new ticket vending machines and ticketing gates. Other than that, escalators and lifts as well as a new Customer Service Office are also provided. Another example is at the second busiest monorail station, Kuala Lumpur Sentral station, where the Nu Sentral Mall overhead bridge becomes the new entrance to the station. Previously, monorail users needed to exit KL Sentral and cross the busy main thoroughfare in Brickfields to reach the station. The completion of the overhead bridge now enables customers to travel between KL Sentral and the monorail station safely and conveniently. The main goal of the fleet expansion project is, however, the introduction of new, state-of-the-art 4-car trains. Two 4-car trains were introduced to the public while the rest were delivered in stages until the fourth quarter of 2015. The new 4-car trains can accommodate up to 430 passengers per trip and could significantly reduce the waiting time for passengers. They are also more comfortable and spacious than the previous 2-car trains. After all sets of 4-car trains were delivered and commissioned, the 2-car trains, which had been in operation since 2003, were retired. Besides having a larger capacity, the new trains are also fitted with better safety features including open-door windows, on-board closed-circuit television cameras and "run-flat" features, which allow the trains to continue moving in the event of a puncture. ==Rolling stock==
Rolling stock
2-car ALWEG rolling stock rolling stock (2003-2022)The first trains used on the KL Monorail line were 10 sets of permanently coupled 2-car trains of a similar design to the Seattle Center Monorail's ALWEG trains. Each monorail train could accommodate 158 passengers during regular operations. The monorail carriages themselves were constructed by Scomi Rail, a Malaysian monorail manufacturer, In June 2017, the monorail was operated solely using 6 sets of 2-car trains. As of December 2022, all 2-car trains had been fully withdrawn from service. 4-car Scomi SUTRA rolling stock rolling stock The KL Monorail subsequently began upgrading its rolling stock to brand-new, 4-car trains. These were also manufactured by Scomi, this time to the company's in-house-developed SUTRA design, which was also ordered by the Mumbai Monorail line in India. Each of these trains can accommodate 430 passengers per trip, compared with 213 passengers for the 2-car trains. Three of the 4-car trains were reinstated in August 2019, with two more expected to re-enter service in November of the same year. In 2019, the KL Monorail service was operated using five sets of 4-car trains and four sets of 2-car trains. Once the delivery of the remaining 7 sets of 4-car trains were completed, the original ALWEG 2-car trains were decommissioned. ==Ridership==
Ridership
The monthly ridership increased from 341,850 passengers in September 2003 to 1.18 million passengers in August 2004. In January 2007, the monorail attained its 50 millionth passenger since its opening. On 29 July 2009, the monorail reportedly reached the 100 million passenger mark. ==Accident and incidents==
Accident and incidents
David Chelliah accident Prior to the opening, on 16 August 2002 an accident occurred during a test run involving a safety wheel falling off a train and hitting the head of a pedestrian walking under the monorail viaduct at Jalan Sultan Ismail. The victim, David Chelliah, a journalist, suffered injuries that required hospitalisation. On 7 March 2003, Chelliah filed a MYR 5 million negligence suit against the companies involved in the design, installation and operation of the trains, as well as the Director-General of Railways. On 8 April 2003, the High Court ruled that the monorail company was liable for the incident, but not the Director-General of Railways. Although the monorail company reported that any such accident was "unlikely" as six bolts would have to be removed for it to occur and furthermore, a check of all 23 other safety wheels on the train involved did not turn up any other issues, the high court judgement ruled that the monorail company "failed to provide a reasonable explanation as to how the safety wheel had come off the train and instead relied on the possibility that there had been tampering by unknown persons". As a result of this accident, the launch of the monorail was postponed. Burst tyre incident On 22 January 2005, a pneumatic load tyre suddenly burst and caused two female passengers to be injured. The train, carrying about 30 passengers, was about to move from Chow Kit station to Titiwangsa station when the incident occurred at about 8.50pm. The burst tyre caused a rubber sidewall panel to flip open which then hit the side of a passenger seat and injured a woman's legs and another woman's hands. Train services were suspended for about 30 minutes following the incident. Breakdown On 11 August 2012, a train stalled near Tun Sambanthan in Brickfields. The breakdown caused 183 passengers to be trapped for about two hours. The air conditioning system in the carriage stopped functioning when the power supply was cut. As a result, some passengers had to break the windows to allow air in while awaiting rescue. Fire and Rescue Department personnel later used a skylift to rescue passengers trapped in the carriage. Investigation revealed that the issue was due to a power supply disruption at the circuit breaker, causing the auxiliary power system to fail. Six days later, another breakdown occurred. A train stalled between Imbi and Bukit Bintang for about 30 minutes, trapping around 200 passengers. This time however, there was power in the train and the air-conditioning system was functional. Train services resumed after half an hour. Maharajalela station fire On 24 December 2020, at around 7:15am a KL Monorail train bound for KL Sentral was approaching the Maharajalela station when one of its tires burst, catching fire. While the Scomi's 4-car train set 24 sustained significant damage, there are no injuries/casualties reported in the incident. Tyre fire On 19 December 2023, a coach guide tyre caught fire and fell from the coach onto the road underneath. The incident happened near Titiwangsa Station. The train was halted and passengers evacuated while the fire brigade dealt with the fire. There were no casualties. Tree collapsed nearby monorail tracks On 7 May 2024, a 50-year old tree near Concorde Hotel Kuala Lumpur collapsed on Jalan Sultan Ismail, hitting 17 vehicles and the nearby monorail tracks, leaving one dead and one injured. The monorail service was disrupted, with temporary suspension of stations between KL Sentral and Medan Tuanku stations for cleaning and repair of the tracks. Normal services resumed at 5.00 pm the next day. ==Proposed extension==
Proposed extension
• Phase 1: from KL Sentral to Happy Garden/Jalan Klang Lama (part of the original 1990s proposal) • Phase 2: from Happy Garden to Sunway (replaced by LRT Kelana Jaya Line extension and BRT Sunway Line) • Phase 3: from Titiwangsa to Matrade ==References==
tickerdossier.comtickerdossier.substack.com