There are two main sites to the school, lower and upper school. The Upper Site also has the new Studio School building. Between the two sites there is a public walkway known as the link path. Students in year 7 are taught in the lower school building. At year 9 the students begin at upper school. Lower school was once known as middle school as it was considered the middle stage of education back when students were expected to find work after their final year at the school - upper school being the last stage of education. The upper school building is joined to the
Knutsford Leisure Centre providing sporting facilities for the P.E department. Outside both buildings are fields with multiple
football pitches and multiple
tennis courts and a three-pitch
astroturf pitch. As of 2014, the Upper Site features a "Studio School", headed by Nicola Hall, who was brought in especially for the job.
George Osborne, member of Parliament for Tatton, was there to officially start the construction of the new site. The site was opened officially on 22 January 2015 by George Osborne. ==Technology==