Operational Line 1 Line 1 is currently 33.3 km long with 22 stations, running from South Ring Road to University Town (South) and
Kunming South railway station. Lines 1 and 2 currently have
through service, which will end when Line 1 Northwest Extension and Line 2 Phase 2 are completed, turning South Ring Road into an interchange station. After the Northwest Extension opens, Line 1 will run from Jiaochang North Road to University Town (South) and
Kunming South Railway Station. The first phase of Line 1 came into operation on May 20, 2013. The second phase of Line 1 came into operation on April 30, 2014. A 5.3 km long branch line to
Kunming South railway station was opened on 26 December 2016. Line 1's route currently consists of an elevated section connecting Kunming to Chenggong and an underground section below Caiyun Road within Chenggong. The northwest extension will be dug underground along the west side of Kunming's city center. It is Kunming's main rail link to Chenggong. Line 1's color is
red.
Line 2 Line 2 is currently 12.4 km long with 14 stations, running from North Coach Station to South Ring Road. Lines 1 and 2 currently have
through service, which will end when Line 1 Northwest Extension and Line 2 Phase 2 are completed, turning South Ring Road into an interchange station. After Phase 2 opens, Line 2 will run from North Coach Station to Haidong Park. The first phase of Line 2 came into operation on April 30, 2014. Line 2's route currently consists of a short elevated section from North Coach Station to Longtou Street and an underground section beneath Beijing Road until the line's current terminus at South Ring Road. Phase 2 will be dug beneath Guannan Avenue and Fubao Road towards Haidong Park. It is Kunming's main north-south line. Line 2's color is
blue.
Line 3 Line 3 started operation on 29 Aug 2017, consisting of 19.16 km of line with 20 stations running from Western Hills Park to East Coach Station. It is Kunming's main east-west line. Line 3's color is
magenta.
Line 4 Line 4 started operation on 23 September 2020, consisting of 43.4 km of line with 29 stations running from Jinchuan Road to . It connects Northwest Kunming and Eastern Kunming to the metro while serving as a second link to Chenggong. Line 4 has cartoon mascots exclusive to the line known as the "K4 Cats" that promote ridership of the line. Line 4's color is
orange.
Line 5 Line 5 started operation on 29 June 2022, consisting of 26.5 km of line with 22 stations running from
World Horti-Expo Garden to Baofeng. Line 5 serves mainly as a tourism line, linking several tourist destinations such as World Horti-Expo Garden, Haigeng Dam, and Haigeng Park. Line 5's color is
green.
Line 6 Line 6 consists of 25.3 km of line with 8 stations running from Kunming Airport to Tangzixiang. Phase 1 opened on 28 June 2012. Phase 2 opened on 23 September 2020, extending the line to Tangzixiang station just south of Kunming's city center. Line 6 temporary ceased operation on 5 March 2016 to complete the two infill stations and reentered operation on 29 August 2017 with a total of four stations. Line 9, the Songming Line, and the Anning Line are planned. All station names that are included in phase 1 of Line 9 have been confirmed. Construction of the planned new lines are currently on hold due to a lack of funding and unstable leadership. ==See also==