The Lee Tunnel, also known as the Stratford to East Ham deep tunnel, is an overflow sewer in East London for storage and conveyance of foul sewage mixed with rainwater. It was built as part of the Thames Tideway Scheme and runs from Abbey Mills Pumping Station down to pumps and storage tanks at Jenkins Lane, Beckton Sewage Treatment Works. It is wholly under the London Borough of Newham.

Construction
Thames Water awarded the construction contract to the MVB JV consortium, comprising Morgan Sindall, VINCI Construction Grands Projets and Bachy Soletanche, in January 2010. The contract price, combined with Thames Water's own improvements was estimated at £635 million. Construction began with sinking of vertical shafts in 2010. In February 2012, the TBM, built by Herrenknecht and named Busy Lizzie, started work at the east end. In 2013, a UK record concrete slipform pour was achieved: 29 days of continual pouring. The tunnel is the deepest bored in London. The tunnel was completed, and opened by Mayor of London Boris Johnson, in January 2016. ==References==
tickerdossier.comtickerdossier.substack.com